My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-1999 Council Packet
Orono
>
City Council
>
1999
>
11-08-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2023 12:54:48 PM
Creation date
4/19/2023 12:51:05 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This project is scheduled to be completed by July 1,2000. An easement will be required for the lift <br />station. The project cost is estimated at $135,000, not including easement costs. <br />This lift station will no longer be necessary after sanitary sewer improvements are completed in <br />conjunction with the Highway 12 realignment project. This work is scheduled for 2006. <br />Femdale Area Lift Stations <br />Three of the five lift stations in this area have required emergency repairs due to rust-through. The <br />lift stations generate frequent high level alarms due to reduced pumping capacities. <br />The scope of proposed work is as follows: <br />• Cleaning, sealing, and minor modifications to the e.xisting forcemain and gravity sewer system. <br />• Rehabilitation of Lift Station No. 1. <br />• Complete replacement of Lift Stations 2 through 5. <br />This project should be completed during the 2000 construction season. A September 30,2000 <br />completion date is projected. Easements would be required for Lift Stations 2 through 5. The <br />project cost is estimated at $230,000, not including easement costs. <br />Recommendations <br />At this time, the City should order easement preparation and project design. The projects should be <br />scheduled for construction in 2000. A total budget of $365,000, not including easement costs, <br />should be established. <br />We are available to discuss this project at any mutually convenient time. Please feel free to call <br />with any questions you may have. <br />Sincerely, <br />BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. <br />John R. Hemming <br />I hereby certify that this report was prepared by me or <br />under my direct supervision and that I am a duly <br />certified Registered Engineer under the laws of the <br />State of Minnesota. <br />yw-. <br />R. Hemming, P.E. <br />Date: November 2. 1999 Reg. No. 24414 <br />K:\ /J9i U999 ! O7\wor^rtp0rts\tener reportdoc
The URL can be used to link to this page
Your browser does not support the video tag.