Laserfiche WebLink
The staff recommendation is that St. Edward’s Church be allowed to connect to the City of <br />Plymouth sewer system. This recommendation is based on the fact that this is an existing <br />nonresidential use with a noncompliant septic system that has limited options for installation of <br />a replacement septic system. <br />The sewer service connection under North Femdale Road should be installed inside a casing pipe <br />for future repair and maintenance without disturbing the road. At a minimum, the casing pipe <br />should be installed with this summers road reconstruction project and all costs charged back to <br />the church. If possible, it would be desirable to complete the entire service installation this <br />summer. <br />We are also recommending that the church be billed directly by the City of Plymouth for their <br />sewer service. <br />If the Council approves the connection to sewer, all conditions of the connection will need to be <br />listed in an agreement between the City of Orono, the City of Plymouth, and St. Edward's church <br />COUNCIL ACTION REQUESTED: <br />Consideration of request from St. Edwards Church, 865 North Ferndale Road, to connect to the <br />City of Plymouth sanitary sewer system. <br />•4 <br />K • trw ,-TTfM," I/.