My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
04-17-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 9:16:11 AM
Creation date
4/18/2023 8:25:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Orono <br /> vo% Hardcover Calculation Worksheet <br /> Property Address: /3 y D Vbfir let A CC (X Yi,t/ II E 04eA/44 <br /> Prepared by: �ol•°R �- c ld t'E 3, / ", Date: 2_22-23 <br /> Stormwater Quality Overlay District Tier: (Circle one) CM) Tier 2 Tier 3 Tier 4 Tier 5 <br /> Step 2: PROPOSED HARDCOVER <br /> In the following table, identify all items of proposed hardcover on the property, keyed by letter to Certificate of <br /> Survey(survey must accompany this form). Include all existing hardcover items that are intended to remain, as <br /> well as all proposed hardcover items that will be added. Use as many lines as necessary to accurately depict <br /> proposed hardcover status of the property. For Tier 1 properties, identify any features by letter which are split at <br /> the 75'setback line and calculate hardcover square footage separately for each portion. <br /> Key to Hardcover Item (Describe) Length x Width Total uare Feet <br /> Survey _� ) <br /> (Example) (Garage) (24'x 30') (720 S.F.) <br /> A _ �4' 'f" 0 Gait ti�► E 3 /7 S.F. <br /> g _toaA t"ti i 9 C S.F. <br /> C T1/> .13 y <br /> S.F.S. <br /> D PA/VEl v4 T ♦ 7 ? S.F. <br /> E (�J,4.Ltc 75 S.F. <br /> F Q CC'K a.7Y S.F. <br /> G PEGK Gt1.I LK 3 2.11 S.F. <br /> H S.F. <br /> i S.F. <br /> J S.F. <br /> K S.F. <br /> L S.F. <br /> M S.F. <br /> N S.F. <br /> O S.F. <br /> P S.F. <br /> Q S.F. <br /> R S.F. <br /> S S.F. <br /> T S.F. <br /> U S.F. <br /> ✓ S.F. <br /> - <br /> W S.F. <br /> X _ S.F. <br /> Y S.F. <br /> Z S.F. <br /> (1) Total Proposed Hardcover I t"7 9 Ay S.F. <br /> Excludable Hardcover(See City Code Sec 78-1884): <br /> S.F. <br /> S.F. <br /> S.F._ <br /> S.F. <br /> - J S.F. <br /> (2) Total Excludable Hardcover Q S.F. <br /> (3) Net Proposed Hardcover [Subtract line(2)from line(1)] 5 Y S.F. <br /> (4) Total Lot Area 2 7 O y S.F. <br /> Proposed Hardcover Percentage [(3)+(4)] 2 V. . y% <br /> Subdivision Application-January 2016 This is an information packet regarding Hardcover. Every effort has been made to <br /> ensure the accuracy of the information contained herein;however,if any information is <br /> not consistent with provisions of the City Code,the Code provisions will prevail. <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.