My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
04-17-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2023 9:16:11 AM
Creation date
4/18/2023 8:25:46 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(6) A developer's contract, including the complete construction plans,specifications and performance <br /> security,shall be submitted by the subdivider for all required public or private improvements which are <br /> to be installed and/or completed after final plat approval. <br /> (7) A certificate of satisfactory completion signed by the city engineer shall be submitted by the subdivider <br /> for all required public and private improvements which have been or were required to be completed <br /> prior to final plat approval. <br /> (8) Any additional information requested by the city administrator or designee or the council. <br /> (9) Payment of applicable fees and payments identified in the development agreement,or preliminary plat <br /> resolution. <br /> (10) Confirmation that all county taxes are paid. <br /> (11) Title commitment or acceptable evidence of title,dated no later than 45 days of the anticipated <br /> recording date. <br /> (12) The final plat. Record plat drawings shall be prepared by a registered land surveyor in accordance with <br /> applicable statute and county regulations and shall be submitted in the form of at least two plastic film <br /> reproducible copies,three copies for Torrens property.Original signatures and certifications shall be <br /> provided on the mounted and reproducible copies for the owners,those possessing any other property <br /> interest,the professional engineer(if applicable), and the registered surveyor.Spaces for certification <br /> by the city(signature lines for the mayor and clerk)shall be provided. <br /> (13) One copy of the final plat reduced to a scale of one inch equals 200 feet. <br /> (d) Application deadlines.The subdivider shall file a complete final plat application with the city administrator or <br /> designee within one year of preliminary plat approval. <br /> (Ord. No.248 3rd series, §1,9-14-2020) <br /> Sec. 82-200. Exception. <br /> (a) Upon request,the city administrator or designee shall,within ten days,certify that the following are <br /> excepted from chapter 82 of the City Code: <br /> (1) A division of property where all the resulting parcels,tracts,lots or interests will be 20 acres or larger in <br /> size and 500 feet in width for residential uses and five acres or larger in size for commercial and <br /> industrial uses,or <br /> (2) Will create cemetery lots,or <br /> (3) Is court ordered,or <br /> (4) Is an adjustment of a lot line by the relocation of a common boundary and no new non-conformities <br /> are created or an existing non-conformity is increased. <br /> (b) Procedure for exempted subdivisions.The owners of such lots to be certified shall file with the city <br /> administrator or designee a certificate of survey of the lots to be divided,and pay the required fee.Such <br /> certificate of survey shall show the dimensions of the lots,as measured upon the recorded plan,the area of <br /> the lots,all corner elevations,all existing structures,including dimensions to existing and proposed property <br /> lines,all visible encroachments,all easements of record, and their proposed division.A written description of <br /> the separately described tracts which will result from the proposed division shall be included on the survey. If <br /> the proposed certification complies with all of the requirements of this section, it will be approved by the city <br /> administrator or designee and forwarded to the county for filing. <br /> Created: 2023-02-03 16:30:29 [EST] <br /> (Supp.No.20) <br /> Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.