My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Prepared by: Bolton & Menk, Inc. MCM 5: POST-CONSTRUCTION STORMWATER MANAGEMENT <br />Orono SWPPP ǀ 0C1.126140 Page 1 <br />IV. MCM 5: POST-CONSTRUCTION STORMWATER MANAGEMENT <br /> Introduction <br />The City of Orono’s Storm Water Pollution Prevention Program (SWPPP) Minimum Control <br />Measure (MCM) 5 addresses post-construction stormwater management. The following <br />plan outlines the tools and procedures to be implemented for prevention or reduction of <br />water pollution after construction activity is completed. <br />1. Party responsible for post-construction stormwater management implementation: <br />City Engineer <br />2. Minimum elements, as set forth in MPCA Permit that provides Authorization to <br />Discharge Stormwater Associated with Small Municipal Separate Storm Sewer <br />Systems under the NPDES Program (Permit No. MNRO400000). <br />a) Regulatory Mechanism (20.3-15) <br />b) Private BMP Inventory (20.16) <br />c) Site Plan Review (20.17) <br />d) Training (20.18) <br />e) Response Procedures (20.19) <br />f) Documentation (20.20-22) <br />g) Annual Assessment (20.23) <br /> Regulatory Mechanism <br />1. City Code: Section 79.1-14 of the City’s current municipal code outlines the <br />requirements of the Storm Water Pollution Prevention Plan, required permits from <br />other agencies, and potential enforcement penalties. <br />2. MOU with MCWD: Memorandum of Understanding between the City and Minnehaha <br />Creek establishing that MCWD will apply and enforce their rules within City <br />boundaries. <br />3. Surface Water Management Plan: The City’s Surface Water Management Plan serve as <br />a comprehensive planning document to guide the City of Orono in conserving, <br />protecting, and managing its surface water resources. <br /> Private BMP Inventory <br />1. Refer to Written Procedures for direction regarding private BMP inventory for post- <br />construction stormwater management <br /> Site Plan Review <br />1. Refer to Written Procedures for direction regarding site plan review for post- <br />construction stormwater management. <br /> Training <br />1. Refer to the Education, Outreach, and Public Involvement Plan for required staff training <br />as it relates to post-construction stormwater management. <br /> Response Procedures <br />1. Refer to Written Procedures for direction regarding response procedures.
The URL can be used to link to this page
Your browser does not support the video tag.