Laserfiche WebLink
<br />Prepared by: Bolton & Menk, Inc. MCM 4: CONSTRUCTION SITE RUNOFF CONTROL <br />Orono SWPPP ǀ 0C1.126140 Page 1 <br />III. MCM 4: CONSTRUCTION SITE RUNOFF CONTROL <br /> Introduction <br />The City of Orono’s Storm Water Pollution Prevention Program (SWPPP) Minimum Control <br />Measure (MCM) 4 addresses construction site runoff control. The following plan outlines the <br />tools and procedures to be implemented for erosion, sediment, and waste control on <br />construction sites. <br />1. Party responsible for construction site runoff control implementation: City Engineer <br />2. Minimum elements, as set forth in MPCA Permit that provides Authorization to <br />Discharge Stormwater Associated with Small Municipal Separate Storm Sewer Systems <br />under the NPDES Program (Permit No. MNRO400000). <br />a) Regulatory Mechanism (Part 19.3-5) <br />b) Site Plan Review (19.6) <br />c) Inspection (19.7-9) <br />d) Public report of non-compliance (19.10) <br />e) Training (19.11) <br />f) Response Procedures (19.12) <br />g) Documentation (19.13-15) <br />h) Annual Assessment (19.16) <br /> Regulatory Mechanism <br />1. City Code: Section 79.1-14 of the City’s current municipal code outlines the <br />requirements of construction site runoff control, including development of a Storm <br />Water Pollution Prevention Plan, required permits from other agencies, and potential <br />enforcement penalties. <br />2. MOU with MCWD: Memorandum of Understanding between the City and Minnehaha <br />Creek establishing that MCWD will apply and enforce their rules within City boundaries. <br /> Site Plan Review <br />1. Refer to Written Procedures for direction regarding site plan review for construction <br />site runoff control. <br /> Inspection <br />1. Refer to Written Procedures for direction regarding inspection for construction site <br />runoff control. <br /> Public Report of Non-compliance <br />1. Refer to Written Procedures for direction regarding public report of non-compliance of <br />construction site runoff control. <br /> Training <br />1. Refer to the Education, Outreach, and Public Involvement Plan for required staff training <br />as it relates to construction site runoff control. <br /> Response Procedures