My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats <br />wq-strm2-47 • 9/27/18 Page 8 of 11 <br />Yes N/A Permanent treatment method selected (continued): <br /> Infiltration (continued) <br />Yes N/A <br /> A pretreatment device is planned <br /> All stormwater routed to the practice can be <br />discharged in 48 hours <br />Note: Any additional flows must bypass the <br />system through a stabilized discharge point <br /> There is a way to visually verify the system <br />is operating as designed <br /> Adequate maintenance access is provided <br /> <br /> Notes <br /> <br /> <br /> Filtration (e.g., sand filters, biofiltration areas, swales <br />using underdrains and check dams, and underground <br />sand filters) <br />Yes N/A <br /> The filtration system is designed to remove <br />at least 80% of total suspended solids <br />(TSS) <br /> The SWPPP includes requirements to not <br />install the filter media until the drainage <br />area is fully stabilized <br /> If the filter media is installed before the <br />drainage area is fully stabilized, rigorous <br />erosion prevention and sediment control <br />BMPs are used to keep all runoff and <br />sediment out of the filtration practice <br /> A pretreatment device is planned <br /> All stormwater routed to the practice can be <br />discharged in 48 hours or less <br /> There is a way to visually verify the system <br />is operating as designed <br /> Appropriate testing has been conducted to <br />ensure a minimum of three feet of <br />separation from the bottom of the filtration <br />practice to the seasonally saturated soils <br />and/or bedrock <br /> If there is less than three feet of separation, <br />the filter has been designed with an <br />impermeable liner <br /> Adequate maintenance access is provided <br /> <br /> Notes <br /> <br /> <br /> Wet sedimentation basin <br />Yes N/A <br /> The basin must provide live storage of one <br />inch (or the remainder of volume not <br />reduced) of runoff from new impervious <br />surfaces <br /> The basin must provide a permanent <br />volume of 1,800 feet3 below the outlet pipe <br />for each acre draining to the basin <br /> The permanent pool depth is between 3 <br />feet and 10 feet <br /> <br /> Notes <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.