My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 Council Packet
Orono
>
City Council
>
2023
>
04-10-2023 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2023 10:03:43 AM
Creation date
4/17/2023 10:00:40 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />www.pca.state.mn.us • 651-296-6300 • 800-657-3864 • Use your preferred relay service • Available in alternative formats <br />wq-strm2-36 • 9/12/18 Page 1 of 4 <br /> <br />Construction stormwater <br />inspection checklist <br />Construction Stormwater Program <br />Doc Type: Permitting Checklist <br />Note: This inspection checklist is an option for small construction sites. Large construction sites and linear projects <br />require more extensive/more location specific inspection requirements. This inspection report does not address all aspects of <br />the National Pollutant Discharge Elimination System/State Disposal System (NPDES/SDS) Construction Stormwater Permit (Permit) <br />issued on August 1, 2018. The completion of this checklist does not guarantee that all permit requirements are in compliance; it is <br />the responsibility of the Permittee(s) to read and understand the permit requirements. <br />Facility information <br />Site name: <br />Site address: Permit number: <br />City: State: Zip code: <br />Inspection information <br />Inspector name: Phone number: <br />Organization/Company name: <br />Date (mm/dd/yyyy): Time: ☐ am ☐ pm <br />Is the inspector trained in sediment and erosion control and is it documented in the Stormwater Pollution Prevention Plan (SWPPP)? <br />☐ Yes ☐ No <br />Is this inspection routine or in response to a storm event: ☐ 7 day ☐ Rain <br />Rainfall amount (if applicable): <br />Is site within one aerial mile of special or impaired water that can potentially receive discharge from the site? ☐ Yes ☐ No <br /> If yes, follow Section 23 and other applicable permit requirements. <br />Note: If NA is selected at any time, specify why in the comment area for that section. <br />Erosion prevention requirements (Section 8.1) <br /> Yes No NA <br />1. Are soils stabilized where no construction activity has occurred for 14 days (including <br />stockpiles)? (7 days where applicable, or 24 hours during Minnesota Department of Natural <br />Resources [DNR] Fish Spawning restrictions) ☐ ☐ ☐ <br />2. Has the need to disturb steep slopes been minimized? ☐ ☐ ☐ <br />3. If steep slopes are disturbed, are stabilization practices designed for steep slopes used? ☐ ☐ ☐ <br />4. All ditches/swales stabilized 200’ back from point of discharge or property edge within 24 <br />hours? (Mulch, hydromulch, tackifier, or similar best management practices [BMPs] are not <br />acceptable in ditches/swales if the slope is greater than 2%) ☐ ☐ ☐ <br />5. Do pipe outlets have energy dissipation (within 24 hours of connection)? ☐ ☐ ☐ <br />6. Is construction phasing being followed in accordance with the SWPPP? ☐ ☐ ☐ <br />7. Are areas not to be disturbed marked off (flags, signs, etc.)? ☐ ☐ ☐ <br />Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.