My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-1999 Council Work Session Packet
Orono
>
City Council
>
1999
>
08-19-1999 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 10:28:52 AM
Creation date
4/13/2023 4:24:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- -Cl <br />1. <br />2. <br />3. <br />R <br />GOLF FUND CAPITAL OUTLAY REQUESTS <br />Replacement and elimination of exterior fuel storage tanks. The Golf Course currently has <br />an exterior fuel storage tank to store fuel for the course maintenance equipment, a fuel <br />storage tank to store fuel for the maintenance shed furnace and a tank to store fuel for the <br />club house furnace. The year 2000 capital requests include the replacement of the exterior <br />fuel storage tank with a concrete enclosed exterior tank to service the course maintenance <br />equipment, the replacement of the maintenance shed furnace with a natural gas furnace to <br />eliminate an exterior storage tank and the replacement of the fuel oil-fired boiler in the club <br />house with a natural gas boiler to eliminate the exterior fuel storage tank. The cost to <br />accomplish these three items are as follows: <br />Concrete enclosed exterior storage tank - $20,000.00. <br />B. Replacement of maintenance shed furnace - $3,300.00. <br />C. Replacement of club house boiler - $4,900.00. <br />Replacement of greens mower - $8,700.00. <br />Purchase of a leaf blower as an attachment to a mower - $8,000.00. <br />i
The URL can be used to link to this page
Your browser does not support the video tag.