Laserfiche WebLink
Co® <br />MCIL <br />)r construction <br />future financial <br />i such time the <br />e on Lot 2. <br />itility easement <br />construction of <br />jments. <br />>n of driveway <br />Drth except via <br />mmended sight <br />c Trail System, <br />5 Sixth Avenue <br />ommission has <br />bike routes are <br />latted in 1986. <br />ire subdivision, <br />the 1986 park <br />arket value of <br />r Section 11.62 <br />ator two weeks <br />Mondays of the <br />CITYof ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. ^2 0 2 <br />1.Record plat drawings in the form of two (2) mylar copies and one (1) copy <br />reduced to 1" = 200'. Drawing to include: <br />A. Lot lines platted per preliminary survey by Mark S. Gronberg of Coffin <br />and Gronberg, dated September 23, 1998, most revised October 26, 1998. <br />B. Dedication of "drainage and utility easements" 10' wide along all <br />perimeter property lines and 5' each side of internal property lines. <br />C. Naming of plat. <br />D. Maintenance and ownership agreement for Outlot A. <br />Legal documents required; <br />A. Title opinion addressed to the City. All owners, mortgage holders or <br />others with property interest indicated therein shall sign the plat and all <br />other documents affected by such interest. <br />B. The subdividers shall provide certified copies of all recorded easements <br />currently affecting the property. <br />C. The subdividers to dedicate to the City a road and utility easement <br />granting permanent access, improvement, and utility easements over said <br />Outlot A. <br />D. The subdividers have created non-exclusive ingress, egress, drainage and <br />utility easements over said Outlot in favor of all abutting and/or <br />benefitting lots including a declaration of certain maintenance covenants <br />wherein all abutting and/or benefitting owners agree to permanently <br />maintain and pay the cost of maintenance for said foture Outlot A. <br />Fees to be paid; Total due: $5.300* <br />A. Final plat fee = S200 <br />B. Legal review fees = $200 <br />Page 4 of 5