My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-11-1999 Council Packet
Orono
>
City Council
>
1999
>
10-11-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:12:27 PM
Creation date
4/13/2023 4:10:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1^ Bonestroo <br />fijlftosene <br />Andeftik& <br />|\j| Associates <br />jnfinf rt4 ArcHilcclt <br />Project Name. Weil No l Maintenance an«J PutTn> Ropdifs <br />Project No_____________________________’ <br />Bid Opening Qclotcf j, 1999 at * 1.00 am, C P S T. <br />Fie No; <br />Owmcr <br />I39.99 10R <br />/ fier0by coft/fy f/taf ihiS h Bn exact <br />feeroductiot\ of bidi received. <br />Cit> ot Ofono <br />Bidder No. 1 <br />Albtrg Weltr Services <br />Nvm Item Units <br />1 Mobftzation; pump removel end <br />reirMlallation <br />2 Televise wcH <br />3 Wire brush casirtg w/SeeH dr*r>g ng <br />4 F & 1 ietiing and air tdWnB equipment <br />5 water jetiinQ/airlfUng <br />6 Supeniilofinalewel <br />7 RebuidpdcMngbox <br />8 F&lss.headshaft <br />9 F&loimpielesetofbcmibedrinos <br />10 F & I new s.$. bowl shaft <br />11 lylaciiirw bowl&impensr&in^l bronze <br />wear rmg. per Mge <br />12 Trim Impeler to reduce capacity <br />13 8* mo* Sch. 40 tail pipe <br />14 270* K 1/2* i d. PVC dip line tube <br />15 10*Sch 40ooiufrvipipo <br />16 8* K 5* Sch. 40 oolumo pipe <br />17 Column coupling <br />IS M/3*x 10* ss. Ine shaft <br />19 1-1/Tx 5* s.s. line shaft <br />20 S.S. shaft ooupBng <br />21 Rubber beanoQ <br />22 Bronze bearing retainer <br />23 Motor inspection, teslmg. and deamng <br />24 Cornplele motor beanng replacement, ri <br />necessary <br />25 Shop lane for sandblasting and mspeding <br />pump components <br />26 F»ld time for venting the outer casing, tf <br />necessary <br />Total Base M: <br />Alternate No. 1 <br />Furrvsh and instal new bowl awmbV. 950 <br />gpmal 240* TDM. 80% ninmHjm efficiency LS <br />Total Alemaie No 1 <br />LS <br />EA <br />LS <br />LS <br />HR <br />LS <br />LS <br />LS <br />LS <br />LS <br />EA <br />EA <br />LS <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />EA <br />LS <br />HR <br />Make: <br />laodel! <br />dot Stages: <br />1 <br />2 <br />1 <br />t <br />40 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />4 <br />1 <br />2 <br />lb <br />1 <br />ir> <br />15 <br />1 <br />2 <br />27 <br />27 <br />1 <br />1 <br />Bidder No. 2 <br />Keys Well Drilling <br />Unit Price <br />$3.500 00 <br />II.OWOO <br />$1.780 00 <br />$3.280 00 <br />$135 00 <br />$67500 <br />$100.00 <br />$200 00 <br />$165 00 <br />$320.00 <br />$150 00 <br />$2500 <br />$160.00 <br />$100 00 <br />$230 00 <br />$170.00 <br />$.30 00 <br />$17500 <br />$135.00 <br />$55.00 <br />$1500 <br />$30.00 <br />$1.000 00 <br />$500.00 <br />$40 00 <br />$40 fX) <br />$4.000 00 <br />Tout <br />OohnR Hcnimmg, P E <br />f?eg/s/ra/#cn No. 24414 <br />Bidder No. 3 Bidder No. 4 <br />E H Renner & Sons trK Bergerson^atwel Inc <br />$3.500 00 <br />$2.000 00 <br />$1,780.00 <br />$3,280.00 <br />$5,400.00 <br />$67500 <br />$100.00 <br />$20000 <br />$16500 <br />$320.00 <br />$600.00 <br />$10000 <br />$160.00 <br />$20000 <br />$3.45000 <br />$170.00 <br />$480 00 <br />$2,62500 <br />$13500 <br />$110.00 <br />$405 00 <br />$81000 <br />$1,000.00 <br />$50000 <br />$80000 <br />$800 00 <br />$29.705 00 <br />$4,000 (XI <br />$4.000 00 <br />Goiids <br />12 CMC <br />3 si3»je <br />UnN Price <br />$4,000.00 <br />$1.100 00 <br />$2,500.00 <br />$1.200 00 <br />$130.00 <br />$2.000 00 <br />$100.00 <br />$350.00 <br />$300.00 <br />$265.00 <br />$140.00 <br />$50 00 <br />$200.00 <br />$150.00 <br />$100 00 <br />$130.00 <br />$30.00 <br />$180.00 <br />$140 00 <br />$40.00 <br />$15.00 <br />$50 00 <br />$300 00 <br />$1,000.00 <br />$4500 <br />$45 rx) <br />$3.250 00 <br />Total <br />$4.000 00 <br />$2.200 00 <br />$2.500 00 <br />$1.200 00 <br />15.200.00 <br />$2,000.00 <br />$100.00 <br />$350 00 <br />$300 00 <br />$285.00 <br />$560.00 <br />$200 00 <br />$200.00 <br />$300 00 <br />$2,700.00 <br />$130 00 <br />$480.00 <br />$2,700.00 <br />$140.00 <br />$80.00 <br />$405 00 <br />$1,350.00 <br />$300.00 <br />$1,000.00 <br />$900.00 <br />$900 00 <br />$30,460.00 <br />$3.250 00 <br />$3,250.00 <br />Pcertess <br />12 ID <br />4 stage <br />Unit Price Total <br />$3.460 00 <br />$1.100 00 <br />$1,200.00 <br />$2.000 00 <br />$180.00 <br />$300.00 <br />$60.00 <br />$22500 <br />$12500 <br />$200.00 <br />$14500 <br />$12000 <br />$273.00 <br />$9500 <br />$223 00 <br />$16900 <br />$3100 <br />$19600 <br />$14700 <br />$75.00 <br />$1200 <br />$35.00 <br />$13000 <br />$1.82000 <br />$35 00 <br />$45.00 <br />$3.20000 <br />$3.46000 <br />$2.200 00 <br />$1.20000 <br />$2,000.00 <br />$7^.00 <br />$30000 <br />$60.00 <br />$22500 <br />$12500 <br />$20000 <br />$56000 <br />$46000 <br />$273.00 <br />$190 00 <br />$3.34500 <br />$15900 <br />$49600 <br />$2,940.00 <br />$14700 <br />$1S0XX) <br />$32400 <br />$945.00 <br />$13000 <br />$1.62000 <br />$70000 <br />$900.00 <br />130.549.00 <br />$3.200 00 <br />$3.200 00 <br />Gouki 12 CMC <br />85 0% <br />3 stage <br />Unit Price <br />$9.000 00 <br />$975 00 <br />$1,750 00 <br />$2.000 00 <br />$175.00 <br />$500.00 <br />$200.00 <br />$500.00 <br />$350.00 <br />$280.00 <br />$200.00 <br />$50 00 <br />1230.00 <br />$200.00 <br />$240 00 <br />$200 00 <br />$1000 <br />$237.00 <br />$160.00 <br />$34.00 <br />$20.00 <br />$45.00 <br />$600 00 <br />$600.00 <br />$45.00 <br />$105 00 <br />$4.650 00 <br />ToMI <br />$900000 <br />$1,950.00 <br />$1,750.00 <br />$2,000.00 <br />$7,000.00 <br />$500.00 <br />$20000 <br />$500.00 <br />$35000 <br />$280.00 <br />$800.00 <br />$200.00 <br />$230.00 <br />$40000 <br />$3,600.00 <br />$200 00 <br />$160 00 <br />$3,555.00 <br />$160.00 <br />$68 00 <br />$54000 <br />lUIS.OO <br />$60000 <br />$60000 <br />$900.00 <br />$2,100.00 <br />$38.858 00 <br />$4.650 00 <br />$4,650.00 <br />Goulds <br />11 CMC <br />4 -stage <br />td <br />o <br />rvj <br />• f <br />o <br />i/I <br />o <br />nr 1 <br />i/I <br />r>j
The URL can be used to link to this page
Your browser does not support the video tag.