My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-23-1999 Council Packet
Orono
>
City Council
>
1999
>
08-23-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2023 4:10:04 PM
Creation date
4/13/2023 4:03:30 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. Cost Analysis <br />Detailed cost estimates for the proposed improvements are presented in the appendices. These costs <br />include a 5 percent contingency, a 20 percent allowance for design, inspection, legal, and <br />administration costs, and a S percent allowance for capitalized interest and bonding costs during <br />construction. The costs are based on 1999 construction and can be related to the ENR index for <br />February, 1999 of 5,858. A summary of the estimated costs for the proposed improvements is <br />presented in Table 1. <br />Table 1. Summary <br />Item Estimated Cost <br />Fullerton Subdivision <br />Sanitary Sewer (Gravity) <br />Sanitary Sewer (Pressure) <br />$241,000 (Option A) <br />$ 162,000 (Option B) <br />The cost estimates do not include easement costs that could be incurred on the project. <br />It is recommended that the sewer construction costs be assessed uniformly over the area to be served, <br />based on the number of services to each property. This results in a charge of $34,429 for each of the <br />7 services. If Option B were chosen the charge for each service would be $23,143. <br />Fullerton Subdivision Sanitary Sewer Improvements
The URL can be used to link to this page
Your browser does not support the video tag.