Laserfiche WebLink
I. Introduction <br />The City Council has requested this report to determine the feasibility of constnicting sanitary sewer <br />improvements for the Fullerton Subdivision area, as shown on Figure 1. Most lots are located on <br />steep slopes making it difficult for homeowners to provide an alternate site for their on-site systems. <br />The topogr:q)hy and proximity to lake shore of the Fullerton area are the primary factors suggesting <br />municipal sewer service is preferable to long term septic system usage. Four residences currently <br />exist on the seven parcels. City records indicate that two properties have conforming systems and <br />two properties have non-conforming systems. The remaining three lots are currently undeveloped. <br />The Fullerton Subdivision was included in the recent MUSA expansion. The City of Orono has <br />received a petition requesting sanitary sewer signed by four of the seven property owners in the <br />Fullerton Subdivision area. <br />This report describes the sanitary improvements required to completely serve the Fullerton <br />Subdivision. The proposed sanitary sewer improvements are presented on Figure 2. An alternate <br />design is presented on Figxire 3. The costs of the proposed improvements are presented in the <br />appendices and a cost summary is presented in the Cost Analysis section. <br />Fullerton Subdivision Sanitary Sewer Improvements