Laserfiche WebLink
CoiiMciL meeting <br />REQUEST FOR COUNCIL ACTION <br />AUG 2 3 1999 <br />C/i I r ur Onc/|\(j <br />DATE: August 23, 1999 <br />ITEM NO.: /O <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Engineer's Report <br />Item Description: Schedule Public Hearing for Fullerton Subdivision Sanitary Sewer Project <br />We have received a petition requesting that the process for a sanitary sewer project in the <br />Fullerton Subdivision be started. This subdivision is at the west end of Fox Street, with lakeshore <br />lots on Stubbs and Maxwell Bays, and was included in the recent MUSA expansion that added the <br />lakeshore area around the northeast side of Maxwell Bay. Existing sanitary sewer is available, just <br />north of the subdivision, at the end of Oxford Street. <br />The petition has been signed by four of the seven property owners. The minimum requirement <br />per Minnesota State Statues Section 429 is for 35% of the owners to sign the petition for it to be <br />considered adequate. A feasibility study was ordered by the Council and has been completed. The <br />property owners have requested that a public hearing be scheduled for this project. <br />The attached map shows the property owners that have signed the petition, the conformity status <br />of the septic systems, and the development status of the lots. The estimated cost for a gravity <br />sanitary sewer system is $34,429 per lot. This project does not require the installation of a <br />municipal lift station. The estimated cost for a grinder pump pressure sewer system is $23,143 <br />per lot. The gravity sewer cost is similar to the cost assessed for the Bracketts Point sewer project <br />with the value of the lots and houses being similar. The houses are very large, and having sanitary <br />sewer service may be desirable. <br />The next step is to hold a public hearing on the proposed project. The public hearing is scheduled <br />for 7:00 p.m. at the regularly scheduled Council meeting. City staff is recommending approval <br />of the attached resolutions accepting the feasibility study and scheduling a public hearing for the <br />F/llerton Subdivision Area sanitary sewer project. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve resolution accepting the feasibility study for the Fullerton Subdivision Area <br />sanitary sewer project. <br />Motion to approve resolution scheduling a public hearing for the Fullerton Subdivision Area <br />sanitary sewer project.