My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-12-1999 Council Packet
Orono
>
City Council
>
1999
>
07-12-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:31 PM
Creation date
4/12/2023 3:37:56 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I/1J Bonestroo <br />Rosene <br />Anderlik &. <br />I Associates <br />Engineers & Architects <br />Bonestroo, Rosene. Andertik snd Associates, tnc. ts an Affirmative ActiOrV^qua! Opportunity Employfr <br />Principals: Occo C. Bonestroo. PE. • Joseph C Anderiiii. PE. • Marvin L Sorvala. PE. • <br />Glenn R. Cook. PE. • Robert G Schunichc. PE. • Jerry A. Bourdon. P£. • <br />RoOerc W. Rosene. PE.. Richard E. Turner. PE. and Susan M. Eoerlin. CM.. Senior Consultants <br />Associate Principals: Howard A. Sanford. PE. • Keith A. Gordon. PE. • Robert R. Pfefferfe. PE. • <br />Richard W Foster. PE • David O. Loskota. PE. • Robert C. Russek. AJ.A. • Marti A. Hanson, px • <br />Michael T. Rautmann. PE. • Ted KField. PE. • Kenneth P. Anderson. PX • Mark R. Rolfs. PX • <br />Sidney P. Williamson, PE., LS. • Robert F. Kotsmith • Agnes M. Ring • Allan Rick Schmidt. PE. <br />Offices: St. Paul. Rochester. Wiiimar and St. Ooud. MM • Milwaukee. Wl <br />WeOsite: www bonestroo com <br />Junes, 1999 <br />Mr. Greg Gappa <br />Director of Ptiblic Service*; <br />City of Orono <br />PO Box 66 <br />Crystal Bay MN 55323-0066 <br />Re: Fox Ridge Feasibility Report <br />File No. 139-GEN <br />Dear Greg: <br />As directed by City staff, we have reviewed the existing conditions and the possible installation of <br />sanitary sewer to serve the Fox Ridge neighborhood. The neighborhood is located on the east and west <br />sides of South Brown Road just south of the Luce Line trail in Orono. There are nine total properties that <br />would benefit from sanitary sewer. City records indicate that most septic systems in the neighborhood are <br />non-conforming or failing. <br />Designs for both a gravity system and a grinder (pressure) system were considered as shown on Figures 1 <br />and 2. The gravity system would require the installation of a permanent lift station in the Fox Ridge <br />neighborhood. Gravity sewer pipe would be installed in the street and carry flows to the lift station. <br />Sanitary sewer services would be extended to the property lines. <br />The grinder system option would require the installation of a common forcemain along the edge of the <br />existing street. Services would be extended to the prq>erty lines. Each residence would be served by a <br />residential grinder station that would pump flows into the common forcemain <br />In both the gravity and pressure options, the sewer pipe crossings under C.R. 146 and the Luce Line trail <br />would be jacked or directionally bored. Both systems assume flows would be pumped to an existing <br />gravity manhole at the intersection of Brown Road and Watertown Road in Long Lake. <br />The following is a summary of the estimated costs for each option: <br />Area # of Units Est. Project Cost Est. Cost/Unit <br />Fox Ridge-Grinder 9 $190,000 $21,100 <br />Fox Ridge-Gravity 9 $304,000 $33,800 <br />The gravity sewer option would require that the sewer be installed in the roadway and therefore complete <br />street reconstruction will be required. Street reconstruction costs have been included in the gravity sewer <br />estimate shown above. The grinder option assumes that the forcemain would be directionally bored along <br />the edge of the roadways and therefore street repairs would be necessary only at manhole locations. <br />The estimated costs are based on 1999 unit prices and can be related to the ENR Construction Cost Index <br />for May, 1999 of 6,006. Soil investigation work has not been completed and the estimated costs are <br />based on typical Orono soils. <br />7:i3c \y/ac» ui/nhxA/aw ;iA ■ ct Paul MM ■ A<;i-6.^6-4Ano ■ Fax: 651-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.