Laserfiche WebLink
FOX RIDGE SANITARY SEWER - GRAVITY OPTION <br />PRFIIMIMARY nnfiT ESTIMATE <br />8" PVC sanitary sewer <br />Jack 8* PVC sewer, Inch Casing <br />Directional bore 4" HOPE forcemain <br />Standard 4’ dia. MH <br />MH overdepth <br />8* X 4’ wye <br />4* PVC service pipe <br />Improved pipe foundation <br />Televise sewer <br />Mechanical trench compaction <br />Submersible pump lift station <br />Connect to existing manhole <br />Mobilization <br />Silt fence <br />Bituminous surface removal <br />Common excavation <br />Geotextile fabric <br />Class 5 aggregate base, 100% crushed <br />Type 31 bituminous base course <br />Type 41 bituminous wear course <br />Bituminous material for tack coat <br />Repair driveways <br />Sod with 4" topsoil <br />Seeding wAodsoII. mulch, and fertilizer <br />LF 28.00 625 $17,500 <br />LF 200.00 75 15,000 <br />LF 22.00 2,300 50,600 <br />EA 1,500.00 5 7,5C0 <br />LF 100.00 10 1,000 <br />EA 75.00 9 675 <br />LF 20.00 270 5,400 <br />LF 1.00 1,075 1,075 <br />LF 1.00 700 700 <br />LF 1.00 895 895 <br />EA 55,000.00 1 55,000 <br />EA 2,000.00 1 2,000 <br />LS 5,000.00 1 5,000 <br />LF 2.50 1,600 4,000 <br />SY 2.00 2,600 5,200 <br />CY 6.00 1,000 6,000 <br />SY 1.50 2,600 3,900 <br />TN 10.00 1,600 16,000 <br />TN 32.00 315 10,080 <br />TN 35.00 235 8,225 <br />GL 1.50 150 225 <br />EA 750.00 9 6,750 <br />SY 2.50 2,350 5,875 <br />AC 3,000.00 0.3 900 <br />Estimated Constnjction Cost <br />•»-5% Contingencies <br />+20% Legal, Engineering and Administration <br />+5% Capitalized Interest and Bonding <br />Total Estimated Cost <br />$229,500 <br />11,475 <br />$240,975 <br />48,195 <br />$289,170 <br />14,459 <br />$303,629