My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1999 Council Packet
Orono
>
City Council
>
1999
>
06-28-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:34 PM
Creation date
4/12/2023 3:37:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IV. Recommendations <br />The following recommendations are made for the proposed Mooney Lake outlet: <br />2. <br />3. <br />Route. The route outlined in Option 1 is preferred and is shown in Figure 3. This <br />route could be modified slightly depending on the desires of the owner of the <br />property between Mooney Lake and County Road 6. <br />Operation. A pumping rate of 1 cfs is recommended for the lift station. The <br />normal water level for Mooney Lake would be allowed to fluctuate between 987 <br />and 988, with the expected high water level for the 10-day 100-year event at <br />990.9. Pumping would be considered at a water elevation of 988 and would be <br />conducted during off-peak conditions in early spring or late fall. An operating <br />plan which ties operation of the pump to the elevation of downstream water <br />bodies in sensitive areas would be developed. The plan would also address who <br />would operate the system. <br />Costs. Preliminary cost estimates for this option are as follows: <br />Construction: <br />Lift station <br />Pipe, manholes <br />Access <br />Easements <br />Power <br />Restoration <br />Contingency <br />$70,000-580,000 <br />$40,000-550,000 <br />0 <br />0 <br />520,000-525,000 <br />$10,000-515,000 <br />$40,000-550,000 <br />TOTAL 5180,000-5220,000 <br />Annual Operation and Maintenance: <br />Electricity (60 days of pumping) $ 1,000 <br />Maintenance, inspection $750 <br />Parts, etc. $250 <br />TOTAL $2,000/yr.
The URL can be used to link to this page
Your browser does not support the video tag.