My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1999 Council Packet
Orono
>
City Council
>
1999
>
06-28-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:34 PM
Creation date
4/12/2023 3:37:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />The developer has indicated that the invert elevation of the existing 36” culvert is 956.7 ft. The invert <br />of the upstream end of the new 18” culvert shall be at the same elevation as the invert of the existing <br />36" culvert. This invert elevation should be confirmed in writing and not allowed to be changed in <br />the fiituie without input and approval of the DNR, Trails & Waterways Unit. Written documentation <br />will also be required to identify the party or parties responsible for maintaining the proposed water <br />drainage structures. We request that the agreement for the maintenance of the drainage structures be <br />between the DNR and the City of Orono, even if the City of Orono requires the homeowners <br />association to maintain the structure. <br />DNR, Trails & Waterways Unit requires inspection authority on the drainage structures and horse <br />trail treadway construction. A minimum of two week advance notice of construction dates will be <br />necessary to alert trail users of trail construction activity. The developer will be responsible for <br />signing and taking precautions to protect the trail users from harm during construction of the drainage <br />structures and horse trail treadway and all restoration work along the trail. <br />Response in writing to these concerns will be needed before the DN'R, Trails & Waterways Unit will <br />support the proposed development as it may negatively impact the Luce Line State Trail, Please keep <br />us informed of future plans for this de'/elopment. <br />Thank you, <br />Suzann Willhite <br />Metro Trails & Waterways Specialist <br />cc; Martha Reger
The URL can be used to link to this page
Your browser does not support the video tag.