My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-28-1999 Council Packet
Orono
>
City Council
>
1999
>
06-28-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:42:34 PM
Creation date
4/12/2023 3:37:13 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1999, revised June 22, 1999 subject to the following conditions: <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />A variance will be granted for width of Lots 3,4 and 5 which do not meet the 200' <br />width requirement for the RR-IB zoning district. <br />All Lots shall access to the private road in Outlot A. No direct access to Old Crystal <br />Bay Road shall be allowed for any Lot. All existing accesses to Old Crystal Bay <br />Road shall be removed prior to City final approval of the private road construction. <br />The private road in Outlot A shall be constructed to City private road requirements, <br />subject to a Developers Agreement to be executed between the City and the <br />developer. Private road construction can begin as soon as the engineerii'g plans for <br />the road as well as stormwater management plans have been approved by the City <br />and the Developers Agreement has been executed. A variance will be granted for <br />the two radii of the private road at 200' and 225'. <br />Private road access shall be from Old Crystal Bay Road subject fo conditions for <br />such access to be approved by the Director of Public Services. <br />The private road shall be privately owned and maintained per the appropriate access <br />easement/maintenance documents to be executed by the developer. The developer <br />shall create a homeowners association for such ownership and maintenance. <br />No building permits will be issued until the private road is completed and all <br />stormwater management improvements have been completed by the developer and <br />approved by the City. <br />The developer shall grant to the City an underlying Road and Utilities Easement for <br />Outlot A. <br />8. The developer shall grant Drainage and Utility easements 5 feet wide along all <br />interior lot lines and 10 feet wide along all right-of-ways and along perimeter lot <br />lines. <br />Page 5 of 9
The URL can be used to link to this page
Your browser does not support the video tag.