My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-1999 Council Packet
Orono
>
City Council
>
1950-2024
>
1997-1999
>
1999
>
06-14-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:34:17 PM
Creation date
4/12/2023 3:30:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•. _ . w ^ .. « ♦*. <br />» . - *'C. :«•••». <br />. .. <br />Contract Unit Total <br />1.Item Unit Quantity -Price Amount <br />J •Bituminous driveway restoratioa *: •. SY....... . : ;:..-600 .•- S21.80 -($13,080.00) <br />i Sod with 4” topscil .....SY ' -5000 S3.60 ($18,000.00) <br />. <br />Seed with topsoil, mulch and fertilizer AC -0.5 $5,235.00 ($2,617.50) <br />i)Erosipa control fence LF -500 SI.80 ($900.00) <br />1 Furnish and plant Evergreen Tree (Blue Spruce) 6' <br />high .............EA . . -4 $484.50 ($1,938.00) <br />t <br />2 Furnish and plant shade tree (Sugar Maple) 4" <br />diameter EA -4 .$127.60 ($510.40) <br />3*Remove and transplant biishcs EA - --------"-4 -$484.50 •($1,938.00) <br />:4 Remove and transplant tree - Desiduous EA -4 $484.50 ($1,938.00) <br />»5 Remove and transplant tree - Coniferous EA -4 S484.5U ($1,938.00) <br />Total Part 2 - Restoration (Deduct)- <br />($71,821.40) <br />Total Part 1 - Sanitary Sewer (Deduct)($181,140.60) <br />Total Part 2 - Restoration (Deduct)($71,821.40) <br />. <br />Total Deduct •• <br />($252,962.00) <br />• <br />Part 1 - Sanitary Sewer (Addition) <br />26 8" PVC sanitary sewer, SDR 35, C-S’ deep LF 1030 $32.20 $33,166.00 <br />27 Connect 8“ PVC to existing manhole EA 1 $2,496.80 $2,496.80 <br />28 4* diameter sanitary MH, 8’ deep, including R- <br />1642-B casting EA 7 $1,779.70 $12,457.90 <br />29 Directional bore 8" HOPE SDR 11 LF 60 $74.80 $4,488.00 <br />30 Direcdonal bore 4* HDPE SDR 11 service pipe LF 585 $48.30 $28,255.50 <br />31 4" PVC cleanout EA 7 $281.10 $1,967.70 <br />32 8” X 4“ PVC service wye branch EA 6 M0.50 $243.00 <br />33 Furnish 8* x 4" PVC wye, cut into ex. 8* PVC EA 3 $1,703.30 $5,109.90 <br />34 4* PVC, SDR 26 service pipe LF 550 $19.00 $10,450.00 <br />35 Mechanical trench compaction LF 1580 $0.98 $1,548.40 <br />SY 100 $9.60 $960.00 <br />36 Insulation <br />37 Sanitary sewer television inspection LF 1030 • $1.60 $1,648.00 <br />Connect 4" PVC to existing home E/i.8 $2,545.30 $20,362.40 <br />38 • <br />Total Part 1 - Sanitary Sewer (Addition) <br />$123,153.60 <br />CtuJTjcOfdcTlJdi
The URL can be used to link to this page
Your browser does not support the video tag.