My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-14-1999 Council Packet
Orono
>
City Council
>
1999
>
06-14-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:34:17 PM
Creation date
4/12/2023 3:30:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FOX RIDGE SANITARY SEWER • RESIDENTIAL GRINDER OPTION <br />PRELIMINARY COST ESTIMATE <br />1 1/2* HOPE service pipe LF 10.00 100 $1,000 <br />1 1/2" HOPE service pipe-directional bore LF 20.00 360 7,200 <br />2" HOPE forceinain-ulrectional bore LF 20.00 2,950 59,000 <br />HOPE service tee EA 50.00 9 450 <br />Curb stop EA 200.00 9 1,800 <br />Cleanout manhole EA 2,500.00 6 15,000 <br />Repair driveways EA 750.00 3 2,250 <br />Bituminous street patching SY 10.00 200 2,000 <br />Connect to existing manhole EA 2,000.00 1 2,000 <br />Erosion control fence LF 2.50 300 750 <br />fviobiiizaiion LS 5,000.00 1 e ryr\r\ <br />Sod with 4* topsoil SY 2.50 2,200 5,500 <br />Seeding wAopsoil, mulch, and fertilizer AC 3,000.00 0.3 900 <br />Residential grinder station EA 4,500.00 9 40,500 <br />Estimated Construction Cost <br />■l■S% Contingencies <br />•l■20% Legal, Engineering and Administration <br />•fS% Capitalized Interest and Bonding <br />Total Estimated Cost <br />*1. <br />$143,350 <br />7J68 <br />$150,518 <br />30,104 <br />$180,621 <br />9,031 <br />$189,652 <br />‘1 <br />i
The URL can be used to link to this page
Your browser does not support the video tag.