My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-10-1999 Council Packet
Orono
>
City Council
>
1999
>
05-10-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2023 3:34:20 PM
Creation date
4/12/2023 3:27:45 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO; <br />FROM; <br />DATE; <br />Liz Veui Zomeren, City Planner/Zoning Administrator <br />Stephen Weckman, On-Site Systems Manager <br />March 4,1999 <br />SUBJECT; Septic Review for Application #2467,Carriage Hill - Subdivision <br />The proposed six lot subdivision requires the use of on-site sewage treatment systems. Site <br />evaluation/design has been completed for primary and alternate drainfield sites on each lot. <br />Due to frozen gound conditions, steiff can ’t verify the accuracy of the soil borings or recommend <br />approval of the subdivision at this time. The information submitted by Westwood Professional <br />Services identifies two drainfield sites on each property meeting all City and State standards. Staff <br />approval of the septic plan will be granted once the City can verify the soil information and complete <br />system design information is submitted by Westwood. <br />The stormwater drainage pond on the southwest comer of the property must be i designed to meet <br />a 55 foot setback from the property line to the highwater mark. The setback is required to eliminate <br />future setback conflicts when septic system upgrades are required on adjoining properties. <br />Based on the above information, staff recommends approval of the application on the condition that <br />the soil information is verified by Staff and all final septic system design infonnation is provided. <br />The city requires the drainfield sites to be fenced off prior to any grading or land alteration. <br />.* .
The URL can be used to link to this page
Your browser does not support the video tag.