Laserfiche WebLink
03/14/99 13:50 FAX 612 337 5601 DSU, INC.@004 <br />The septic field locations must be fenced off and protected from construction ‘ <br />activities. <br />PRORIQN CONTROL <br />The developer must ensure that erosion control be provided, monitored and <br />maintained wherever needed until the vegetative cover in the disturbed areas of <br />each lot has been fully and finally restored. <br />If you have questions regarding these comments, or If I can be of further <br />assistance, please call me at 339-3300. <br />DAHLQREN, SHARDLOW, and UBAN, INC. <br />Wallace L. Case, ASIA <br />Landscape Architect/Planner <br />.4-