Laserfiche WebLink
Contract Unit Quantity Current Amount <br />No. Item Unit Quantity Price to Date Quantity to Date <br />Approved Alternate No. 1 <br />1 Temporarv’ controls, pumps and piping Tor <br />interim conveyance LS 1 5,500.00 0.91 0.63 5,000.00 <br />2 Lift station demolition or new valve vault LS 1 6.800.00 0.88 0.88 6,000.00 <br />3 New pumps, piping, valves, wet well, top <br />hatch, and slab LS 1 74,000.00 1.00 0.40 74.000.00 <br />4 New control panel, base slab, and <br />miscellaneous electrical LS 1 20,000.00 1.00 1.00 20,000.00 <br />5 Seeding with 4 inch topsoil SY 30 4.00 <br />6 Sod with 4 inch topsoil SY 10 8.00 <br />7 8 inch Class S aggregate base TN 17 40.00 <br />8 3 inch thick bituminous driveway TN 8 90.00 <br />1 <br />i <br />TOTAL WORK COMPLETED TO DATE $105,000.00 <br />K;\139\139-M- 1\WORO\nEQUEST2.WB2