Laserfiche WebLink
Micheal P. GafTron <br />Page Two <br />3. Schematic building elevations will be provided under separate cover prior to <br />March 10,1999. <br />Respectfully submitted. <br />WOLD ARCHITECTS AND ENGINEERS <br />George Gorbatenko, Jr., ALA <br />Enclosures: <br />Schedule Of Drawings (City C.U.P. Submission Packet) <br />Sheet C1.0 Boundary Survey and Topographic Survey-Junior High School Site <br />Sheet C1.1 Partial Topographic Survey-Ice Arena/High School Site <br />Sheet C1.2 Site Removals Plan <br />Sheet Cl.3 Middle School-Site Geometric Plan <br />Sheet C1.4 Middle School-Paving, Signage and Striping Plan <br />Sheet C1.5 Middle School-Grading and Utilities Plan <br />Sheet Cl .6 High School-Geometric, Paving, Signage and Striping Plan <br />Sheet C1.7 High School-Grading and Utilities Plan <br />Sheet C1.8 Middle School and High School-Landscaping Plan <br />Sheet C1.9 Construction Details <br />Sheet CLIO Construction Detai Is <br />Architectural Upper Level Plan <br />Architectural Lower Level Plan <br />Site Lighting <br />Legal Description (See sheet Cl 0) <br />Certified Property Owners List <br />cc:lay Pomeroy, AJA <br />Pat Arug, Arug Environmental <br />Kevin Sullivan <br />Scott McQueen <br />Susanna Strand <br />jnV990l6.'fcb9V <br />4 <br />1 <br />V. • •. • <br />Ql <br />-----