My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-12-1999 Council Packet
Orono
>
City Council
>
1999
>
04-12-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 1:44:00 PM
Creation date
4/6/2023 1:35:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
475
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
tj <br />10. <br />11. <br />If a signal is warranted, the applicant shall be responsible for the full cost for the <br />design and installation of the signal. The design and installation of the traffic <br />signal shall be subject to the review and approval of the City Engineer. <br />If the warrants for a traffic signal are not met, the applicant shall be responsible <br />for the full cost for the design and installation of a flashing yellow light warning <br />system at the crosswalk. This system shall have provisions for both pedestrian <br />activation and a scheduled time of day activation. The design and installation of <br />the traffic signal shall be subject to the review and approval of the City Engineer. <br />A certificate of occupancy will not be issued for any of the planned improvements <br />until a City approved traffic warning system is installed. <br />If the signal warrants are not met at this time, the City reserves the right to <br />complete future warrant analysis if traffic or pedestrian crossing conditions change. <br />The applicant shall be responsible for notifying the City of any changes in <br />pedestrian crossing conditions. <br />If any future warrant studies show that signal warrants are met, the applicant shall <br />be responsible for the full cost of designing and installing a traffic signal subject <br />to review and approval of the City Engineer. In the event that the applicant does <br />not install a future warranted signal within a reasonable time period after <br />completion of the warrant analysis, the City reserves the right to complete the <br />signal installation and assess the applicant for the cost of the improvements. <br />Upon City Engineer approval of the installation of either a flashing light or traffic <br />signal system at the pedestrian crossing, the City will own and operate the system. <br />Applicant shall provide geotechnical recommendations and pavement design prior <br />to building permit approval. <br />Applicant shall provide the sanitary sewer plan to be approved by the City <br />Engineer. All sanitary and storm sewer manholes and catch basins shall have an <br />exterior sealing sleeve. The sanitary sewer shall have 18 inches of clearance <br />below the water main at all sanitary sewer/water main crossings. <br />Page 7 of 11
The URL can be used to link to this page
Your browser does not support the video tag.