Laserfiche WebLink
CITY OF ORONO <br />1998 BID TABULATIONS FOR STREET MATERIALS & EQUIPMENT RENTAL <br />ALL QUANTITIES ARE BID IN TONS - EQUIPMENT IS BID PER HOURLY RATE <br />* Denotes low bid <br />ALL PRICES TO <br />BE DELIVERED <br />12" CMP <br />16 GAUGE <br />15" CMP <br />16G\UGB <br />18" CMP <br />16 GAUGE <br />24" CMP <br />14 GAUGE <br />24" CMP <br />16 GAUGE <br />36" CMP <br />14 GAUGE <br />48" CMP <br />12 GAUGE <br />. <br />60" CMP <br />10 GAUGE <br />Johnston Fargo 9.00 10.00 12.00 22.00 17.00 32.00 60.00 90.00 <br />All Steel Products 8.30 10.45 12.50 21.00 16.60 31.00 56.00 87.00 <br />Contech 7.75*9.75*11.75*19.50*15.75*29.75*54.50*85.50* <br />ALL PRICES TO <br />BE DELIVERED <br />12" <br />APRON <br />15" <br />APRON <br />18" <br />APRON <br />24" <br />APRON <br />36" <br />APRON <br />48" <br />APRON <br />60" <br />APRON <br />Johnston Fargo 44.00 54.00 70.00 106.00 310.00 836.00 1460.00 <br />All Steel Products 39.00 49.00 64.50 96.00 260.00*690.00 1105.00* <br />Contech 38.25*48.50*63.00*94.50*280.00 670.00*1175.00 <br />ALL PRICES TO <br />BE DELIVERED <br />12" <br />BAND <br />15" <br />BAND <br />18" <br />BAND <br />24" <br />BAND <br />36" <br />BAND <br />48" <br />BAND <br />60" <br />BAND <br />Johnston Fargo 9.00 10.00*12.00*17.00*32.00*60.00*90.00* <br />All Steel Products 8.30*11.30 13.50 22.00 45.00 85.00 180.00 <br />Contech 15.00 19.50 23.50 31.50 59.50 109.00 171.00 <br />A <br />% <br />‘1