Laserfiche WebLink
Actual 1982 Assessed Amounts; <br />PINS# <br />17-117-23 34 0005 <br />17-117-23 34 0006 <br />17-117-23 34 0007 <br />17-117-23 34 0008 <br />Trunk Area Trunk Unit Bypass Lateral <br />1.34 ac = $ 2,680.-0--0-NA <br />1.43 ac= 2,860.-0--0-NA <br />-0--0--0-NA <br />3.13 ac= 6.260. <br />5.90 ac = $11,800. <br />-0--0-NA <br />Development of the subject property is not responsible for the 1982 Sewer Lateral Charge, <br />since the cost of the laterals constructed in 1982 was spread over the properties they directly <br />served. The original Trunk Unit charge of $760. per unit has inflated to $1,140. per unit in <br />the 1999 fee schedule and is due for this new development, as is the LS #6 Bypass & plant <br />unit charge of $460. per unit as indicated in the 1999 fee schedule. Also, because the <br />proposed development density uses credit for the wetland area (allowable because it is <br />sewered property), an incremental Trunk Area charge of 9.9 ac- 5.9 ac= 4.0 acres should be <br />charged at the 1999 rate of $3,010. per acre. <br />Sewer Connection Charges Summary (Calculation based on 29 units) <br />Trunk Unit & Bypass: $1,140. + $460. = $1,600. per unit x 29 units = <br />Trunk Area: $3,010./acre x 4.0 acres = <br />Less credit for LS-63-1B lateral sewer <br />Total Sewer Connection Charges Due <br />$46,400. <br />. 12.Q4.(L <br />$58,440. <br />( 7.063.^ <br />$51,377. <br />Page 3 of 4