My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1999 Council Packet
Orono
>
City Council
>
1999
>
02-22-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 1:36:46 PM
Creation date
4/6/2023 1:33:29 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
14. The subdivider shall provide a signage plan for entry signs and monuments prior <br />to construction, subject to review and approval by the Public Services Director. <br />15. The subdivider shall provide a plan for mailbox location and treatment to be <br />reviewed and approved by the Public Services Director. <br />16. The subdivider shall submit a landscaping plan after tree removal, grading and <br />rough framing have been completed in order to evaluate the site conditions and <br />determine the need for more landscaping and screening. The landscape plan <br />shall be reviewed by the City's consultant and reviewed and approved by the <br />City Council prior to certificate of occupancy being issued. <br />17. The subdivider shall identify all junk, debris, or hazardous materials on the site <br />and document, remove and dispose of the materials in accordance with ail <br />applicable rules, guidelines and laws. No cut trees, timber, debris, earth, rock, <br />stones, soil, junk, rubbish, or other waste materials of any kind shall be buried <br />in any land, or left or deposited on any lot or street at the time of the issuance <br />of a certificate of occupancy. <br />18. The subdivider is hereby advised that preliminary subdivision approval will <br />expire within one year of the date of Council approval, February 22, 2000. If <br />the subdivider fails to complete the final plat within one year, a new application <br />will be required. <br />19. Subdivider is hereby advised that the City cannot grant final plat approval until <br />a permit from the Minnehaha Creek Watershed District has been approved for <br />all grading and drainage improvements on the property. <br />The following list of final submittals must be submitted to the Zoning Administrator 30 <br />days prior to the regularly scheduled Council meetings. Required submittals are as follows: <br />1.Record plat drawings in the form of two (2) mylar copies (one copy for the <br />City's records and one for filing with Hennepin County) and one (1) copy <br />reduced to 1" = 200 ’. Drawing to include: <br />A. Lot lines platted per preliminary survey by Westwood Engineering, Inc. <br />dated September 25, 1997, most revised date February 4, 1999. <br />Page 7 of 11
The URL can be used to link to this page
Your browser does not support the video tag.