Laserfiche WebLink
PROM LEONARD. STREET AND DEINARD (FRl) 2. 5’99 14:42-ST. 14:33 NO.42604SS259 F 6 <br />Brimhall Triangle, in other words, assignment of the State of Minnesota’s highway <br />easement over the Briiniiall Triangle to the City ofLoag-Loke. Orono. <br />A .Prfmiptly tki> h^f-Knon **rurna<t hftclr” d. The parties are <br />aware that, while MnT)oT has au****^*'^^ “#nrn hark” the hiphwnv easeii <br />City of Long Lake, became tht»Hrimh«ll Triangle is in the city limits of Long Lake. <br />Therefore, the nartie< witi a<ik the City of Long Lake shaU to plav the role nf the rit\ <br />assign all of its rights and obligations <br />in the Brimhall Triangle to the City of Orono promptly after MnDoT *Turns back** the <br />highway easement to the City of Long Lake <br />4. Option 3 — Fallback Option. <br />If neither Option 1 nor Option 2 is ftUly implemented by February 1, 2000, then permanent <br />access to the Service 800 Parcel shall be provided through the Brunhall Triangle and the Otten <br />Parcel as shown on Exhibit D as follows: <br />a. Developer and Otten shall jointly apply to NtnDoT for a permit to install a private <br />road in the Brimhall Triangle as shown on Exhibit D. Developer shall provide all plans and <br />specifications required by MnDoT at Developer’s expense. The plans and specitications <br />shall be revised as necessary to meet any reasonable demands by MiiDol <br />b. Otten hereby grants to Developer a perpetual, nonexclusive easement through the <br />Otten Parcel for a private road and private utilities. The easement shall become cftcctive <br />on February 1, 2000. if by that date neither Optiuu 1 uoi Option 2 is fully imptemented. <br />The easement area is a 30-foot wide right-of-way. The centerline of the right-of-way <br />begins at Point A, continues to Point B and terminates at Point C, as sbowti on Exhibit D. <br />Point A is the intersection of the northeasterly extension of Brimhall Avenue with tlie <br />south line of the Otten Parcel 65 to 70 feet west of the southeast comer of the Ouen <br />r'arcel. Point B is 35 feet south of and 55 feet west of the northeast corner of the Otten <br />Parcel, measured parallel with and perpendicular to the east line of the Otten Parcel. Point <br />C is on the cast linr. of the Otten Parcel and 35 feet south of the northeast corner of the <br />Ouen Parcel. <br />c.Within four months after MnDoT issues the private road permit. Developer shall <br />install the private road through the Brimhall Triangle and the Otten Parcel as shown on <br />Exhibit D at Developer’s expense. <br />d. If Developer fails to install its access road as shown on Exhibit D by June 1, 2000, <br />then the City of Orono shall install or complete the access road and charge all costs to <br />Developer. As security for Developer’s obligation to reimburse the C ity ot Orono, <br />Developer shall provide the City of Orono with an irrevocable letter of credit in the <br />amount ofS S20.000. The form of tlie letter of credit must be acceptable <br />174751902