Laserfiche WebLink
itI <br />Practicality <br />1. The natural grade of the pnqierty is such that the highest point is the northwest comer. Placing the <br />building on the east side would result in additional grading, and retaining wall(s) and fencing would be <br />required along the north property line. <br />2. Since the water and power lines run along the west side of the propert>*, placing the building on the <br />west allows for the most efifecient access to ser\ ices. <br />3. If the building was relocated to the east property line and the driveway entered the propert}* on the <br />middle of the west line, the best location for the building's main entrance w ould be in the middle of the <br />west side. Since the building has alread>’ been comfrietely pbnned including interior layout, that effort <br />would have to be scrapped and the entire building would have to be reengineered. <br />4. Due to Orono's standard process of Planning Commission Re\iew plus two Council Rc% iews, re­ <br />submitting applications for the building on the east property line would cause an additional 6 week to 2 <br />month delay in the project <br />Ihank you for consideration. <br />Sincerely, <br />Creative Resource! to Monitor <br />Customer Satisfaction Every Day <br />B B <br />SERVICE 8 0 0, INC./.W612-475-3747 <br />/w6 i2-A75-3773