My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-08-1999 Council Packet
Orono
>
City Council
>
1999
>
02-08-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 1:34:38 PM
Creation date
4/6/2023 1:32:19 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />COUMCIL MEETING <br />•"EB 8,1994 <br />I r Oh OHUlsiO <br />DATE: February 8, 1999 <br />ITEM NO. <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed:Agenda Section: <br />Engineer's Report <br />Item Description: Request for Final Payment Bracketts Point/Bay Ridge Sanitar/ Sewer Project <br />We have reviewed the information submitted by the City's engineering finii and recommend <br />approval of this Final Request for Payment. The project included a change order necessitated by <br />poor soil conditions encountered during consuaiction. The original plan was to install some of the <br />sewer by directional boring methods for access reasons and to protect trees, with the remainder <br />of the sewer being installed by open cut methods. Poor soils were anticipated in the open cut <br />installation areas and provisions for lightweight aggregate, to compensate for the poor soils, were <br />included in the plans and specifications. The soils were of such poor quality that, even with the <br />use of light weight aggregate, installation of the pipe by open cut methods was not possible. The <br />change order substituted about 1,200 feet of directional bored pipe for open cut pipe installation. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve Final Request for Payment, Bracketts Point/Bay Ridge Sanitary Sewer Project <br />to Barbarossa & Sons in the amount of $25,514.73
The URL can be used to link to this page
Your browser does not support the video tag.