Laserfiche WebLink
Item <br />Total price for the renovation of the Navarre Water Treatment <br />Facility , including demolition, process equipment (by bas^ bid <br />manufacturers, as described in Part III of this Proposal) plumbing, <br />HVAC, electrical work, conUols and instrumentation, process <br />piping, painting, and all other items shown, specified, or <br />implied to place the facility into full operation for <br />Contract <br />Unit Quantity <br />Unit Quantity Current <br />Price to Date Quantity <br />Amount <br />to Date <br />ihc LUMP SUM of:LS 636,600.00 <br />Breakdown of above: <br />Mobilization & Div. 1 37.894.00 100%100%37.894 <br />Demo - Lab.12,944.00 100%15%12,944 <br />Demo • Mat.11,850.00 100%15%11,850 <br />Concrete Bottom - Lab.10,121.00 <br />Concrete Bottom - Mat,10,360.00 <br />Div. 5 • Lab.493.00 <br />Div. 5 - Mat.1.173.00 <br />Div 8 • Lab.1,190.00 <br />Div. 8 - Mat.4,989.00 <br />Softening Equip • Ext.5,200.00 40%40%2,080 <br />Softening Equip - Int.9,000.00 100%70%9,000 <br />Filter Equip - Ext.13,500.00 40®;.40*/o 5.400 <br />Filter Equip - Int.31,000.00 100*/.70%31,000 <br />Piping & Valves 13,600.00 <br />Interior 6,600.00 <br />Filter Equip - Lab.15,692.00 10%10%1,569 <br />Filter Equip • Mat.53.793.00 10%I0*/o 5,379 <br />Softening Equip - Lab.2,352.00 20%0%470 <br />Softening Equip - Mat.17,038.00 10*/.0*/o 1,704 <br />Filter Media - Lab. <br />Filter Media • Mat. <br />Softening Media • Lab. <br />Softening Media • Mat. <br />Chemical Feed • Lab. <br />Chemical Feed • Mat. <br />Pumps • Bal. <br />Pumps - Mat. <br />Blower - Lab. <br />Blower • Mat. <br />Piping 8c Valves • Lab. <br />Piping 8c Valves • Mat. <br />4,200.00 <br />28.375.00 <br />563.00 <br />18.554.00 <br />7.352.00 <br />8.393.00 <br />7.500.00 <br />16.827.00 <br />5.987.00 <br />6.757.00 <br />26.922.00 <br />87.181.00 50%22%24,518 <br />l;\139\13997\REOUEST3.WB2