Laserfiche WebLink
Change Order No. 3 <br />Add <br />Total Change Order No. 8 <br />IA139M 39e8Ve<)uest11 .wb2 <br />12'* corrugated PE pipe LF 154 19.00 147 2,793.00 <br />12" PE F.E.S.with trash guard <br />Delete <br />EA 1 625.00 1 625.00 <br />66 12" RCP in place LF (154)22.00 -154 (3,388.00) <br />69 15" RCP flared end in place with trash guard ea 0)900.00 -1 (900.00) <br />Total Change Order No. 3 (SS70.00) <br />Change Order No. 4 <br />52 4* diam. sump catch basin manhole EA 4 1,200.00 4 4,800.00 <br />53 Catch basin manhole overdepth LF 3 125.00 3 375.00 <br />54 Bituminous surfacing removal SY 400 1.00 400 400.00 <br />55 Common excavation CY 5,400 3J5 5400 17,550.00 <br />63 Sawcut bituminous LF 206•1.50 206 309.00 <br />67 15" RCP in place LF 209 24.00 209 5.016.00 <br />69 15" RCP flared end in place w/TG EA 1 900.00 1 900.00 <br />50 Clear and grub EA 7 300.00 7 2.100.00 <br />Total Change Order No. 4 $31,450.00 <br />Change Order No. 5 <br />55 Common Excavation CY 480 3.25 480 1.560.00 <br />56 Class 5 Aggregate Base (100% Crushed)TN 940 9.20 940 8.648.00 <br />Total Change Order No. 5 SI 0.208.00 <br />Change Order No. 6 <br />III Modular block retaining wall SF 500 1840 379 6.973.60 <br />Total Change Order No. 6 S6.973.60 <br />Change Order No. 7 <br />56 Class 5 aggregate base (100% crushed)TN 310 9.20 108 993.60 <br />57 Type 31 bituminous base Course TN 150 23.50 150 3.525.00 <br />58 Type 41A biutminous wear course TN no 27.50 no 3.025.00 <br />61 Bituminous street patching SY 430 6.50 512 3.328.00 <br />Total Char.ge Order No. 7 SIO.871.60 <br />Change Order No. 8 <br />III Common Excavation - Add CY 4,022 7.00 4022 <br />28.154.00 <br />76 Sod w/4" topsoil • Deduct SY (8,800)225 8800 (19.800.00) <br />S3.354.00