My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-1999 Council Packet
Orono
>
City Council
>
1999
>
01-25-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 2:20:47 PM
Creation date
4/6/2023 1:31:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
71 Improved pipe ftid. in 6" increment depth <br />72 Remove existing CMP culvert <br />73 Furnish and install 15" CMP culvert <br />74 15" CMP flared end <br />75 Riprap, Class III hand placed <br />76 Sod with 4" topsoil <br />77 Seed with topsoil, mulch and fertilizer <br />7S Erosion control fence <br />79 Wood fiber blanket <br />80 Furnish and plant Evergreen Tree (Blue <br />Spruce) 6’ high <br />81 Furnish and plant shade tree (Sugar Maple) <br />4* diameter <br />82 Remove and replace wood or chain link fence <br />83 Remove and transplant bushes <br />84 Remove and transplant tree - Desiduous <br />85 Remove and transplant tree • Coniferous <br />86 Salvage and reinstall wood guard post <br />Total Part 3 - RestoraUon <br />Part 4 - Ice Arena Duplex Grinder Station <br />87 Duplex submersible grinder station <br />88 2" HOPE, SDR 11 <br />89 Connect to existing manhole <br />90 2" Hu ®E 45 degree bends <br />Total Part 4 • Ice Arena Duplex Grinder Station <br />LF 595 0.01 <br />LF 450 2.00 100 200.00 <br />LF 450 12.00 427 5,124.00 <br />EA 30 100.00 16 1,600.00 <br />CY 12 30.00 22 660.00 <br />SY 28,000 2.25 20281 45,632.25 <br />AC 2 1,550.00 0.9 1,395.00 <br />LF 1,000 2.50 1336 3,340.00 <br />SY 750 1.50 524 786.00 <br />EA 6 225.00 6.5 1,462.50 <br />EA 6 500.00 1 500.00 <br />LF 600 15.00 100 1,500.00 <br />EA 12 75.00 <br />EA 12 150.00 <br />EA 15 150.00 <br />EA 11 50.00 11 550.00 <br />$289,597.15 <br />LS 1 18,600.00 1 18,600.00 <br />LF 1,160 6.00 1105 6,630.00 <br />EA 1 1.000.00 I 1,000.00 <br />EA 2 50.00 2 100.00 <br />S26.330.00 <br />Part 5 - Lift Station 6 Renovation <br />Temporary controls, pumps and piping for <br />interim conveyance LS 1 2,000.00 1 2,000.00 <br />92 Lift station demolition LS 1 5,000.00 1 5,000.00 <br />93 New pumps, piping, valves, top hatch <br />and slab LS 1 35,000.00 1 35.000.00 <br />94 Ne\; control panel, base slab, dialer, wd <br />miscellaneous electrical LS 1 24,000.00 1 24,000.00 <br />95 Sod SY 50 2.25 50 112.50 <br />96 8' Class 5 aggregate base TN 75 12.00 73 876.00 <br />97 3" thick bituminous driveway TN 30 45.00 30 1,350.00 <br />Total Part 5 • Lift Station 6 Renovation 568,338.50 <br />l:\139M 3988\request 11-wb2
The URL can be used to link to this page
Your browser does not support the video tag.