My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-1999 Council Packet
Orono
>
City Council
>
1999
>
01-25-1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 2:20:47 PM
Creation date
4/6/2023 1:31:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Co, REQUEST FOR COUNCIL ACTION <br />Meeting <br />JAH 2 5 <br />0*= OHOW <br />DATE: January 25. 1999 <br />ITEM NO.: / <br />Department Approval: <br />Name Gregory A. Gappa <br />Title Director of Public Services <br />Administrator Reviewed: Agenda Section: <br />Engineer's Report <br />Item Description: Order Feasibility Study for Fullerton Subdivision Sanitary Sewer Project <br />We have received a petition requesting that the process for an assessment sanitary sewer project <br />in the Fullerton Subdivision be started. This subdivision is at the west end of Fox Street, with <br />lakeshore lots on Stubbs and Maxwell Bays, and was included in the recent MUSA expansion that <br />added the lakeshore area around the northeast side of Maxwell Bay. Existing sanitary sewer is <br />available, just north of the subdivision, at the end of Oxford Street. We have met with some of <br />the property owners to discuss this project. They are aware that because of the large lots this wiil <br />be a very expensive project, with costs similar to the recent Bracketts Point sewer project. They <br />are also aware that this will be a fully assessed project, and that the costs may vary dependent on <br />the number of properties that will be included in the project. A review of the attached map <br />showing the locations of the properties for which Lhe owners have signed the petition, suggests <br />it may be feasible to construct a project to serve these lots. Options and costs will be addressed <br />in the feasibility study. <br />The petition has been signed by four of the six property owners. The minimum requirement per <br />Minnesota State Statues Section 429 is for 35% of the owners to sign the petition for it to be <br />considered adequate. The next step after receipt of the feasibility study is to hold a public hearing <br />on the proposed project. City staff is recommending approval of the attached resolution declaring <br />adequacy of the petition and ordering preparation of a feasibility smdy for the Fullerton <br />Subdivision sewer project. <br />COUNCIL ACTION REQUESTED: <br />Motion to approve resolution declaring adequacy of the petition and ordering preparation of a <br />feasibility study for the Fullerton Subdivision sanitary sewer project.
The URL can be used to link to this page
Your browser does not support the video tag.