My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-07-12 Septic System Site Eval & Testing
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Rd
>
1400 Bracketts Point Rd - PID: 11-117-23-32-0025
>
Septic
>
1993-07-12 Septic System Site Eval & Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:03 PM
Creation date
4/5/2023 3:16:24 PM
Metadata
Fields
Template:
Address
House Number
1400
Street Name
Bracketts Point
Street Type
Road
Address
1400 Bracketts Point Road
Document Type
Septic
PIN
1111723320025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nn r�n•rnt r�iCT'T2iRIi-T'TDN SYSTEM <br />1. Select number of perforated laterals <br />2. Select perforation spacing = _5 feet <br />3. Since perforations should not be placed closer than 1 ft. to <br />the edge of the rock layer (see diagram), subtract 2 ft. from <br />the rock layer length. <br />-- 2 ft. = _T feet <br />Roa Ter W" 8, <br />4. Determine the number of spaces between perforations. <br />Divide the length above by perforation spacing and round <br />down to nearest whole number. <br />I <br />Length perf. spacing = ft. y 2)f I. = Zo spaces <br />S. Number of perforations is equal to one plus the number of <br />perforation spaces. <br />go spaces + i = 21 perforations per lateral <br />Multiply perforations per lateral by number of laterals to <br />get total number of perforations. <br />A 21 = � perforations <br />Iasaral s pars L~W <br />7. Determine required flow rate by multiplying <br />number of perforations by flow per perforation <br />&3 x�=Zgpm. <br />If laterals are connected to header pipe as shown on upper <br />example, select minimum required lateral diameter from <br />table 2; enter table with perforation spacing and number <br />of perforations per lateral. Select minimum diame r for <br />perforated lateral = inches <br />CW PEWORATIOW Of A POWORATM LATCRAL <br />lVw Cw <br />r 7— .T <br />L.V- .l deems. I.0r4 I. a✓' <br />Luw•~�rwM mom•• aww <br />I•a.r.�aaw W Th wrua+wut <br />b: <br />An L.... Q* 16" <br />.1 4.0 L.W <br />►r aa.•1.r1. t..•1•.a •1 <br />Dow i-. U� Mlr•w N UNn1 <br />o.grn s.0 /..wa► s.�m.. <br />a•w• I••o.� S..I L...r <br />TABLE OF [ LRFORATION OLSCHARGFS IN GPM <br />Heed Perforation dlarnater (inches) <br />lard Y /rW .1 <br />r/} <br />r/• <br />lab <br />036 <br />0.74 <br />0.69 <br />0.90 <br />16 <br />0.30 <br />1.04 <br />15 <br />0.89 <br />1.17 <br />3-0 <br />0.98 <br />128 <br />4D <br />1.13 <br />1.47 <br />SD <br />1.26 <br />145 <br />a Use 1.0 foot o(head for residential systems. <br />b,Um 2 0 (cet of head (or other establishments <br />Irshlw 2 <br />Maa+� dlaedMaMs�� of �r irad MefentM� N <br />� rral(ast+� <br />lard Y /rW .1 <br />•-+ cwt 1.25 inch 1-5 inch 2.0 inch <br />2.5 14 <br />18 <br />8 26 <br />3.0 13 <br />3.3 12 <br />16 <br />25 <br />4.0 11 <br />15 <br />23 <br />5.0 10 <br />14 <br />22 <br />9. If perforated lateral system is attached to manifold pipe near <br />the center, As in lower example, perforated lateral length and <br />f--_hnumber of perforations per lateral will be approximately one (f--- <br />half <br />alf of that in 11' 6. Using these values, select minimum <br />AZ <br />diameter for perforated lateral from table 2 <br />perforated lateral = %, S inches <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.