Laserfiche WebLink
Page 8 - 0120 86-74 <br />450 gallons, based on a three bedroom. Type 1 residence, the required total <br />treatment area is about 570 square feet. <br />We suggest scarifying (tilling) the surface sod and then bringing in about 2' <br />of sandy loam, loam or sand with about 10% fines. The fill material should <br />only receive light compaction, sufficient to achieve a density equivalent to <br />long-term settlement under its own weight. After the fill placement, trenches <br />should be dug to a depth of about 2'-21', and these should be about 3' in <br />width. About 9" of filter rock should be placed below the perforated laterals. <br />For 3' wide trenches, the total trench length should be about 190'. Four -48' <br />long trenches spaced about 6' apart (71' on center) would require filling an <br />area of about 70' x 50' for the primary system. About 26 cubic yards of <br />filter rock would be needed. Where any trench extends to within 8' of a tree <br />or potentially large tree, additional filter rock should be placed. <br />We strongly discourage the use of a garbage dis)osal. Traffic of all types, <br />except for occasional mowing of the grass with light equipment, must be <br />restricted throughout the year. The system should be monitored and the septic <br />tank should be pumped, probably eery two years or so, to promote longivity <br />of the soil treatment system. The existing sprinkler system must be removed <br />from the new drainfield area. <br />FIELD EXPLORATION PROCEDURLS <br />The borings were made on April 17, 1985. The borings were put down at the <br />locations suggested by you or disciissed with you as shown on the attached <br />Soll LXIPLORENtlon <br />