My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-20-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
09-20-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 4:24:55 PM
Creation date
3/22/2023 4:23:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mi Bonestroo <br />Rosene <br />mrwj Anderlik & <br />Associates <br />Engineers & Architects <br />September 15, 1999 <br />Mr. Paul Weinberger <br />Zoning Administrator/Planner <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 55323 <br />Re: Willow View Subdivision <br />File No. 139GEN-2522 <br />Scn^itroo ^isociAtei. Inc an Affirmative Actfon, iquai Cpport^rit/ £rnpioyer <br />?^>rc pals Ct:o G 3ore.:r30. • Joseph C AncJcrii*«. I Sorvjiid. P.£ • <br />Glenn R Coo«. p£ • ?oCea G Schumcnc. PE • Jerry A. Bourdon. p£ • <br />RoOerc W Rosene. ?£ . R»cn,vd E Turner. P£ and Sus.in M EOerim. C PA . Senior Consultants <br />Associate Principals Howard A Sanford. PE • Keith A Cordon. P£ • Rooert R. Pfeffene. PE • <br />Richard W Poste' PE • David O Losiiota. P£ • RoDert C Russck. A 1 A • Marie A Hanson. P£ • <br />Michael T Rautmann PE • Ted K field. P£ • Kerwieth P Anderson. PE. • .Vtark R. Rolfs. PE • <br />Sidney P Xiiiiamson. PE. L S • Rooert f Kotsmith • Agnes M Ring • Allan Rich Schmidt. PE <br />Offices St Paul. Rochester Wiiimar and St Cloud. MN • VMwauhee. ’JUI <br />Ureosite wwwOcncstroo com <br />1^1 1 I Wl ,Q <br />Dear Paul: <br />We have reviewed the preliminary grading and utility plan for the proposed 49 lot Willow View subdivision. <br />The site is located west of Willow Drive and south of County Road 6 in the southeast quarter of Section 28. <br />We have the following comments in regards to engineering matters. <br />1. Sanitary Sewer; The preliminary sanitary sewer design appears acceptable. It should be noted that the <br />proposed temporary bypass lift station along T.H. 12 needs to be in place before sewer service can be <br />provided to the Willow View site. Final plans should include plan and profile views of the proposed <br />sewer, sewer service locations and sanitary sewer details. Sanitary services should be located 3-feet <br />downstream from water services. All sanitary and storm sewer manholes are required to have an e.xterior <br />sealing sleeve as manufactured by Infi-Shield or an approved equal. Any connections to existing manholes <br />shall be core drilled and a rubber boot installed. <br />2. Water Main: The proposed water main shown between Lots 12 and 13, Block 3 should be extended <br />westerly and tied into the 12-inch water main installed as part of the new Orono Middle School project. <br />The water main alignment should coincide with the utility easement on the school property located just <br />south of the soccer fields. We also recommend e.xtending the 8-inch water main northerly to the <br />intersection of Willow Drive and County Road 6. This will allow for a future connection to the City of <br />Medina’s water system. Final plans should include plan and profile views of the proposed water main, <br />water main details and service locations. All water main shall be poly wrapped. <br />3. Grading: We recommend that the lowest basement elevations be at least 2-feet higher than the high water <br />level (HWL) of the closest pond. Proposed basement elevations on some lots on Blocks 1,2 and 3 do not <br />provide this 2-feet of freeboard. We would recommend revising the grading plan or basement elevations <br />to allow a minimum of 2-feet of freeboard. It appears that ponds located in Outlot C will flood the <br />property to the south when they reach their HWL. We recommend revising the proposed grading plan so <br />that ponded water is contained to at least 0.5-feet above the HWL. Block 5 appears to have a low, <br />landlocked area behind the homes. This will result in drainage problems and additional storm sewer may <br />be necessary. An erosion control plan should be submitted for review. <br />4. Storm Sewer: The draft version of the City’s Surface Water Management Plan (SWMP) shows that this <br />site lies within the Long Lake drainage district. The proposed grading plan shows ponding throughout <br />the site. It is unclear how alt of the ponds are supposed to function. None of the ponds has an outlet <br />shown. The pond in the northwest comer of the site has no inlet or outlet shown. The pipe shown <br />between Lots 6 and 7, Block 3 outlets to a wetland. All storm sewer should outlet to a ponding area. All <br />ponds should meet NURP standards. Ponds should have a 10:1 aquatic bench at the pond’s normal water <br />2335 West Highway 36 • St. Paul, MN 55113 ■ 651*636-4600 • Fax; 651*636*1311
The URL can be used to link to this page
Your browser does not support the video tag.