My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-20-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
09-20-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 4:24:55 PM
Creation date
3/22/2023 4:23:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORONO PLANNING COMMISSION <br />MINUTES FOR AUGUST 16,1999 <br />(#2517 Scott and Lisa Bittman, Continued) <br />Bittman stated that there was a previous second story to this residence, with the roof being removed <br />in an effort to determine the extent of the work needed. Bittman stated that a building permit had <br />been applied for prior to the work being commenced but the process took over two months for the <br />permit to be issued. <br />Jenson stated that an application for a building permit was submitted. Jenson commented that the <br />entire second story of the residence is being replaced. <br />Bittman stated they are replacing the second story due to the deteriorated state of the residence. <br />Kluth commented that he does not want tc enccurage people to commence work on their residences <br />without the appropriate building permits, notir^ that sometimes the improvements are required to be <br />tom down if the work is completed without the ap propriate building permits. <br />Lindquist stated that normally a building permit is obtained within two weeks. <br />Bittman stated that a survey was required, which took two months to obtain. <br />Weinberger stated the building inspector had given the approval for the work to continue due to <br />concerns regarding the present damage to the house. <br />Lindquist moved, Smith seconded, to recommend approval of Application #2517, <br />25 Brown Road South, to allow a. front yard variance to add a second story to the existing <br />home within the 50 foot setback to Brown Road South. VOTE: Ayes 5, Nays 0. <br />PLANNING COMMISSION COMMENTS <br />(#13) OTHER ISSUES FOR DISCUSSION <br />Mayor Jabbour stated the Planning Commission and City Council needs some continuity regarding <br />the Issue of plastic undertayment and whether it should be considered as hardcover or legally <br />non*conformlng. Jabbour stated he has a concern that people are trading in non-conforming <br />structures or hardcover in an effort to make their properties more legally conforming and that <br />perhaps the City Council and Planning Commission should take the view that the non-conforming <br />structures or hardcover should be immediately removed. <br />Kluth commented that It would be nice if the Planning Commission could be provided with copies <br />of all previous variance requests on a property whenever a new application is submitted. <br />Mayor Jabbour commented that perhaps the issue dealing with hardcover should be explained prior <br />to the application reaching the Planning Commission. <br />Smith suggested that the Applicants be given examples of what is allowed and not allowed for <br />hardcover as part of their application, especially if the property owner is new to the application <br />process. <br />Page 11
The URL can be used to link to this page
Your browser does not support the video tag.