Laserfiche WebLink
Date of Appl: -ation: 7/22/98 <br />Most Revised Date: 6/8/99 <br />60 day limit: Waived <br />Structural Coverage <br />Total Lot Size Structural Coverage <br />Allowed <br />Structural <br />Coverage Proposed <br />Variance <br />Requested <br />10,350 sq. ft. <br />(.237 acres) <br />1,552. 5 sq. ft. <br />(15%) <br />1,498 sq. ft., <br />(14.5%) <br />none <br />The original plan proposed by the applicant was for an additional 250' of structure. The residence <br />and garage have been redesigned to conform to code standards for structural coverage. <br />Hardcover <br />Distance from <br />Shoreline <br />Total Area <br />in Setback <br />Existing <br />Hardcover <br />Allowed <br />Hardcover <br />Proposed <br />Hardcover <br />Variance <br />Requested <br />0’-75 ’5,860 sq. ft.1,285 sq. ft. <br />(22%) <br />None 638 sq. ft. <br />(11%) <br />638 sq. ft. <br />(11%) <br />75'-250'4,490 sq. ft.1,496 sq. ft. <br />(33%) <br />1,122.5 sq. ft. <br />(25%) <br />1,356 sq. ft. <br />(30%) <br />233.5 sq. ft. <br />The proposed residence exceeds the allowed hardcover limits in both the 0'-75’ and 75'-250’ setbacks. <br />However the total hardcover has been reduced from the original plans. <br />Land Alteration <br />The proposed survey indicates that the applicant intends to excavate and remove a total of 124 cubic <br />yards from the property. Excavation is proposed within the 75 ’ lakeshore setback to create a walkout <br />and correct some minor drainage issues. <br />Generally, the City of Orono discourages any grading or excavation in the lakeshore setback. This <br />proposal is not consistent with the Zoning Code and Comprehensive Plan and may have a negative <br />impact on the lake. <br />*2410 <br />Peter Boynton <br />1973 Fagerness Point Road <br />PC-1/19/99 <br />page—4