My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-19-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
07-19-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 4:01:10 PM
Creation date
3/22/2023 3:57:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Minnehaha Creek -M.'Watershed District £■ <br />Improving Quality ofWater, Quality of Life <br />Gray Freshwater Center <br />Hwys. 15 & 19, Navarre <br />Mail: <br />2500 Shadywood Road <br />Exce'sior.MN 55331-9578 <br />Phone:(612)471-0590 <br />F^ (612) 471-0682 <br />Email: <br />adminOminnehahacreek.org <br />V/eb Site: <br />wwwjninnehahacreek.org <br />Board of Managers <br />Pamela 6. BToct <br />James CaOdns <br />Lance Fisher <br />Monica Gross <br />Thomas W.LaBounty <br />Thomas Maple, Jr. <br />Malcolm Reid <br />0 PrWtd on neycM pipor oontaining <br />«iuit 30% port oonitfntr vMtt. <br />I' • . t .. ; >" ' <br />, •* <br />* • <br />December 30,1998 <br />Elizabeth Van Zommeren <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, MN 55323-0066 <br />RE: Review of Proposed Projects <br />Dear Ms. Van Zommeren: <br />We have reviewed the site plans for proposed projects in Orono which will be on public <br />fr tf **'°'^* Projects will need pemitsfrom the Minnehaha Creek Watershed District. The following comments apply^ <br />There appears to be no wetland ft>VWR)lO <br />or floodplain impacts. If the project involves grading of more than 5,000 square feet -------- <br />an erosion control permit will be required. ^ <br />nf.'r’r'" »nd <br />K ^ ^ around all wetlands. The width of those uiT^iwk. <br />buffers wll depend on the surface area of the wetland. If any filling, draining or <br />aSvIty*”* planned within the wetland boundary a permit will be required for that <br />require a floodplain W£»o«W£ <br />permit. A cut and fill summary would be needed to determine whether or not a net — <br />from the planned activity <br />4. #2450: This project will be required to provide BMP’s for stormwater management <br />als?be requirTd^"*" involved an erosion control permit will <br />you for the opportunity to comment. Please call me at 471-6282 if you have <br />further questions. <br />Sincerely, <br />hjm Hafner <br />District Technician <br />C:\FILES\commcnis\Orono^ 123098.doc
The URL can be used to link to this page
Your browser does not support the video tag.