My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1999 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1990-1999
>
1999
>
04-19-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 2:51:29 PM
Creation date
3/22/2023 2:44:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monday February 22,1999 <br />First Draft <br />To: Paul E. Weinberger <br />Assistant Zoning Administrator <br />City of Orono <br />received <br />f EB 2 2 1999 <br />Qi't VJr- ORONO <br />Paul, <br />We have put together some of our thoughts on the plans we submitted to you last <br />Wednesday, and would like you to look them over and share them with the staff. We <br />would like to here back as soon as possible as to what the general feeling is toward <br />this project. We very much appreciate your time and effort in this matter. <br />The following is a list of hardships we would like you to consider for the approval of our <br />revised building plans. <br />1) We have complied with city setbacks which will have far less variance deficiencies <br />than the existing structure. <br />2) The existing foundation is not sufficient for a remodeling/addition project <br />3) Because of the water table on the site, we are unable to have a basement figured <br />into the overall square footage of livable space, meaning a potential loss of 33% <br />of such space for storage, etc. <br />4) The size of the house is not out of character for Balder Park Extension which is <br />comprised of mostly 50 foot wide lots. <br />5) The current zoning laws do not include 50 foot lots, which puts us in total rwn- <br />conformance. Zoning of said lots needs to be revised to bring them current with <br />the times. <br />6) Over the last 5 years we have incurred substantial hardship due to the cities <br />misgrading of Birch Lane. This is a water drainage problem which we have <br />discussed with both the previous city engineer and the present engineer. We feel <br />to mitigate, the city needs to: a) correct this problem <br />b) allow building plans <br />Bruce and Betsy Nusbaum <br />3480 North Shore Drive <br />cciGabbriel Jabbour, Mayor
The URL can be used to link to this page
Your browser does not support the video tag.