My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
04-19-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 2:51:29 PM
Creation date
3/22/2023 2:44:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
laserfiche2
Created:
3/22/2023 2:51 PM
Modified:
3/22/2023 2:51 PM
Text:
http://www.bonestroo.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Bonesuoo. Kosent. Andertik tnd AstociMet, kK. Is *n AffirmMive Actlon/Cqual Opportunity employer <br />ca. <br />Bonestroo <br />Rosene <br />Anderlik & <br />iVl 1 Associates <br />Principals: Otto G. Bonestroo. P.E. • Joseph C. Anderlik. PE. • Mjrvin L Sorvala. PE. • <br />Richard E. TUmer. PE. • Glenn R Cook. PE. • Rotoeri G. Schunichi. PE. • Jerry A. Bourdon. PE. • <br />Robert W. Rosene. PE. and Susan M. Eberlin. C.P.A. Senior Consultants <br />Asiociate Principals: Howard A. Sanford. P£. • Keith A. Cot^n. PE. • Robert R. Pfefferle. PX • <br />Richard W. Foster. PE. • David O. Loskota. PE. • Robert C. Russek. A.I.A. • Mark A. Hanson. PE. • <br />Michael T. Rautmann. PE. • Ted K.Fleid. PE. • Kenneth P. Andersoa PE. • Mark R. Rolfs. PE. • <br />Sidney P Williamson. P£.. LS. • Robert F. Kotsmitn • Agnes M. Ring • Michael P. Rau. PX • <br />Allan Rick Schmidt. PE. <br />Engineers & Architects Offices: St Paul. Rochester. Willmar and St Cloud. MN • Milwaukee. Wl <br />Website: www.bonestroo.com <br />AprU 5.1999 <br />Elizabeth VanZomeren <br />City Planner/Zoning Administrator <br />City of Orono <br />Post Office Box 66 <br />Crystal Bay, MN 55323 <br />Re: Peter Andrea Subdivision <br />File No. 139-2479 <br />Dear Liz: <br />We have reviewed the preliminary plat for the proposed seven-lot subdivision for the Peter <br />Andrea Company. The site is located west of Stubbs Bay Road North and south of TH 12 in the <br />north half of Section 32. We have the foUowing comments in regards to engineering matters. <br />1. Access: The proposed access location off from Stubbs Bay Road appears accqitable. T^e <br />proposed roadway will need to have a minimum paved width of 28 feet to meet City <br />standards for a public or private street serving 7 or more units. The proposed cul-de-sac is <br />approximately 1100 feet long where City standards allow for a maximum cul-de-sac length of <br />1000 feet. The plans should be reviewed for any conflicts with the future realignment of <br />T.H. 12. The developer should be aware that the City will reconstruct Stubbs Bay Road this <br />summer and eliminate the at grade railroad crossing and the existing access at T.H. 12. There <br />is a need for a future cast west roadway bttween Stubbs Bay Road and Orchard Park Road. <br />It makes sense at this lime to make provisions for a future westerly extension of the proposed <br />roadway serving this property. City staff should research and further review possible <br />aUgnments for a future westerly roadway extension prior to preliminary plat approval. It may <br />make sense to dedicate 33 feel of right-of-way along some or ail of the west boundary of the <br />parcel. Thirty-three feet of right-of-way currently exists west of the west property bouiM-iy. <br />Thirty-three feet of right-of-way also exists from the southwest comer of this parcel to <br />Orchard Park Road. Final plans should include geotechnical reccmmendations aiuJ street <br />design including horizontal and vertical curve information. <br />2. Grading: A grading and erosion control plan for the entire site should be submitted for <br />review. It appears that driveway and sfreet construction will require some wetland filling. <br />Driveway locations should be shown and wetland impacts identified on the final plan set. <br />Erosion control measures should be in place prior to any grading, particularly along the <br />wetlands. AddiUonal erosion control will be needed during construcUon of the houses and <br />septic systems. <br />3. Drainage: The draft version of the City ’s’ Comprehensive Storm Water Management Plan <br />(SWMP) shows that the site lies within two major drainage districts. The northerly and <br />southerly portions of the site flow to the west and lie within the Painters Creek drainage <br />district. Final plans should include water quality provisions for storm water leaving the <br />northerly and southerly portions of the site. The central portion of the site flows easterly and <br />lies within the Lake Classen drainage disu^ict. The receiving water body for the Lake Classen <br />portion of the site is a wetland Identified as LC-C-32 in the SWMP. The weUand is located <br />E <br />2335 West Highway 36 ■ St. Paul. MN 55113 • 651-636-4600 ■ Fax: 651-636-1311
The URL can be used to link to this page
Your browser does not support the video tag.