My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-19-1999 Planning Packet
Orono
>
Planning Commission
>
1999
>
04-19-1999 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2023 2:51:29 PM
Creation date
3/22/2023 2:44:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
309
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MESIMUM MATERIAL REQUIRED FOR COMPLETE PRELIMINARY APPLICATION <br />1. Pa>inent of fees (refer to "application fees" listed below. <br />2. Completed application form. <br />3. Preliminary plat information on Certificate of Survey. <br />4. Certified Property Owners List of owners within 350' (you must obtain this list from Hennepin County Department of Finance A-603 <br />Goa Cente^48-327lD <br />5. As an addendum to this application, please attach a ^arate list of any other persons you wish notified of this application. <br />Zoning Official's Signature _______________________________________Date________________________________ <br />MINIMUM MATERIAL REQUIRED FOR COMPLETE FINAL APPLICATION <br />1. Payment of fees (refer to Preliminary Subdivision Approval resolution and park fees if appicable). <br />2. Signed Certificate of Survey or mylar copies of formal plat <br />3. Title opinion. <br />4. Easements, covenants, etc. <br />5. Developers Agreement and Letter of Credit <br />Zoning Official's Signature ______________________________________Date________________________________ <br />L APPLICATION FEES (Zoning Administrator to check [X] those which apply) <br />A. Application Base Fees: Totals <br />Sketch Plan Review (Class I, n&m) $250.00 ______ <br />X Subdivision of a Lot Line Rearrangement $350.00 <br />_____ Subdivision Application (Class I & n) $350.00 ______ <br />_____Preliminary Sul^vision Application $375.00 + $25.00/lot (Class III & all non-residential) ______ <br />_____Final Plat Application (Class ni) $200.00 ______ <br />_____ Legal Review and Filing: <br />_____Subdivision only $75.(X) ______ <br />_____Subdivision w/easements and covenants min. $200.00 ______ <br />_____ Park Fees (to be determined per Section 11.62) ______ <br />____Legal and Engineering Review Fees (as incurred) ______ <br />_____Renewal of Class I and II Subdivision Application $200.(X) (No change from original application) ______ <br />_____Renewal of Class III, Preliminary Subdivision Application $200.(X) (No change from original application) ______ <br />_____ Renewal of Final Class III Subdivision Application $ 150.00 (No change from original application) <br />B. Special Improvement Fees: <br />_____ Proposed Private Roads $600.00 + $.50/lineal ft.;_____lia ft. x .50 •= $______ ______ <br />_____ Proposed Public Roads $9(X).(X) + $.50/lineal ft.;_____lin. ft. x .50 = $_____ ______ <br />_____ Request for City to Accept Existing Private Road $900.00 ______ <br />_____ Proposed Sanitary Sewer Main Extension $250.00 + $25/stub ______ <br />_____ Proposed Watermain Extension $250.00 + $25/stub ______ <br />_____ Proposed Storm Sewer System (excluding culverts) $200.00 ______ <br />_____ On-Site System, Site Evaluation Review (applicable to rural subdivision applications) <br />$50.00/per lot x _____new lots ______ <br />C. Flexible Application Fees/Misc. Fees <br />_____ Variance $220.00 ($50.00 per each additional variance) ______ <br />_____ Easement Vacation Associated with Subdivision $ 100.00 ________ <br />_____ PRD Application with Subdivision $30.00/Dwelling Unit ______ <br />The applicant hereby agrees to provide all information required or requested by the Zoning Administrator, City Engineer, City Attoraej*. <br />Plaiming Commission and Council necesst^^to process this application and further agrees to pay all additional^f^ established by <br />ordinance. <br />Applicant's Signature <br />Owner's Signature _ <br />Date <br />Date <br />Applicant must have all submittals into the City Office 25 days before the Planning Commission meeting. Planning Commission meetings <br />are held on the third Monday of each month. Applicants must be present at all scheduled review meetings of the Planning Commission <br />and Council. If an applicant is unable to attend a scheduled meeting, please make arrangements to have an authorized agent attend in }*our <br />place and to advise the Building & Zoning Office of this change prior to the meeting.
The URL can be used to link to this page
Your browser does not support the video tag.