Laserfiche WebLink
Micheal P. Gaffron <br />Page Two <br />3. Schematic building elevations will be ptlDvided under separate cover prior to <br />March 10, 1999. <br />Respectfully submitted, <br />WOLD ARCHITECTS AND ENGINEERS <br />George Gorbatenko, Jr., AIA <br />Enclosures: <br />Schedule Of Drawings (City C.U.P. Submission Packet) <br />Sheet C1.0 Boundary Survey and Topographic Survey-Junior High School Site <br />Sheet C1,1 Partial Topographic Survey-Ice Arena/High School Site <br />Sheet C1.2 Site Removals Plan <br />Sheet C1.3 Middle School-Site Geometric Plan <br />Sheet C1.4 Middle School-Paving, Signage and Striping Plan <br />Sheet Cl.5 Middle School-Grading and Utilities Plan <br />Sheet C1.6 High School-Geometric, Paving, Signage and Striping Plan <br />Sheet C1.7 High School-Grading and Utilities Plan <br />Sheet Cl.8 Middle School and High School-Landscaping Plan <br />Sheet C1.9 Construction Details <br />Sheet C1.10 Construction Details <br />Architectural Upper Level Plan <br />Architectural Lower Level Plan <br />Site Lighting <br />Legal Description (See sheet Cl.O) <br />Certified Propert>' Owners List <br />cc:Jay Pomeroy, AJA <br />Pat Arug, Arug Environmental <br />Kevin Sullivan <br />Scott McQueen <br />Susanna Strand <br />jiiV990l6/feb99 <br />'i--.