My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-20-2000 Planning Packet
Orono
>
Planning Commission
>
2000
>
11-20-2000 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2023 12:37:48 PM
Creation date
3/21/2023 12:33:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Memo <br />Project Name: Orono Apartments Traffic Review <br />To: <br />From: Bryant Ficek <br />Re: Traffic Flow for the Orono Apartments <br />Client: City of Orono <br />File No: 139-98-000 <br />Date: 11/07/00 <br />^ I Bonestroo <br />Rosene <br />Andedik& <br />Associates <br />4 Architecti <br />0 <br />The proposed Orono Apartments will be located in the northwest quadrant of the intersection of Trunk <br />Highway (TH) 12 with Brown Road North in Orono, Minnesota. 1 To development currently exists on this <br />site. The current site plan, dated October 17, 2000, shows two buildings. One building is proposed to be an <br />apartment complex with 70 dwelling units and would be located on the east side of the site, next to Brown <br />Road North. The other building is proposed to be an office building vvith approximately 23,200 square feet <br />of area and would be located on the west side of the lot. <br />Using the Institute of Transportation Engineers â trip generation rates for developments of this kind, the <br />following table shows the estimated traffic volumes to and from the site. <br />Time Period <br />Office E <br />In <br />building <br />Out <br />Senior I <br />In <br />iousing <br />Out <br />Total Site <br />In <br />Trip Ends <br />Out <br />Average Weekday 130 130 120 120 250 250 <br />AM Peak Hour 30 5 5 5 35 10 <br />PM Peak Hour 5 30 5 5 15 35 <br />Average Saturday 30 30 90 90 120 120 <br />Average Sunday 10 10 95 95 105 105 <br />As shown in the table, the site could expect about 250 vehicles in and 250 vehicles out of the site during a <br />typical weekday according to the size and type of these developments. <br />Site Access <br />The current site plan shows the three access drives to and from the proposed development. The first access <br />drive connects to Brown Road North on the east side of the lot. We would recommend aligning this site <br />access drive, if possible, w'ith the access to the bank and private homes on the east side of Browm Road <br />North, creating one four-legged intersection rather than two closely spaced âTâ intersections. One lane in <br />each direction on the access drive should suffice for the expected amount of traffic. From this full access <br />driveway, motorists could continue south to the existing full access intersection of Brown Road North with <br />TH 12. Motorists should expect delays at this intersection of Brown Road North and TH 12 due to the <br />traffic volumes on TH 12. We would not recommend a signal at this TH 12 intersection since other nearby <br />intersections in both directions on TH 12 have existing signals. The current geometries at this TH 12 <br />intersection are also adequate for the expected amount of traffic. <br />Bonestroo, Rosene, Anderlik and Associates <br />2335 West Highway 36 + St. Paul. MN 55113 + Phone: 651-636-4600 + Fax: 651-636-131 1
The URL can be used to link to this page
Your browser does not support the video tag.