My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-21-2023 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2020-2029
>
2023
>
02-21-2023 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2023 8:33:24 AM
Creation date
3/21/2023 8:33:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION <br /> February 21,2023 <br /> 6:00 o'clock p.m. <br /> Ms. Yorks responded it's a problem that they caused themselves. There were things that had to be <br /> corrected,probably,but not to this extent. She said she had photos which Curtis did not have available. <br /> McCutcheon invited her to pass her phone around the table. <br /> Curtis clarified that the applicant's engineer has approved plans as designed. We don't approve their <br /> engineering,their civil engineer takes the responsibility by stamping the plans. <br /> Ms.Yorks said the work is too egregious.And then after-the-fact,I mean, come on,really?The whole <br /> thing is just egregious. I get that it was an emergency. <br /> McCutcheon said it's one of those things with the construction season, and I'm not trying to make <br /> excuses,but I'm just trying to be logical about it.If you start pulling back layers of the onion and you're <br /> holding that much earth back,you do have to act with a sense of urgency.Was it handled the best way? <br /> Obviously,we would like them to go to City first,which they did. They came in--well, after-the-fact, of <br /> course,but they did try to make it right. <br /> Margaret Martin,2821 Casco Point Road. I sent in this information earlier in an email and it is from a <br /> member of the family who is a civil engineer, a geotech.You have all that information and I won't go <br /> through all of the points,but I will just reiterate a couple of the things that he emphasized.He indicated <br /> that the wall does not appear to be replaced in-kind and therefore should fall under scrutiny of new <br /> construction.It increases impervious surfaces within the buffer, increases discharge to the lake and does <br /> not appear that anything has been done to naturalize the shoreline, and I understand timeframe with <br /> winter etc.,that that can't be addressed immediately. Surface drainage pads have not been identified. Tree <br /> Removal completed prior to plan approval has been discussed. The damage caused by this disturbance <br /> may put neighboring properties at risk in the future and this has been addressed. So again,you have a <br /> printed version and this is from an engineer who is very knowledgeable.But moreover,we need to <br /> consider the fact that that allowing things to go through sets precedents that should not be given in our <br /> City so that people think they can get away with it and do things not according to how they're set up. <br /> These rules were set up by our City and should be complied with. <br /> Commissioners took some time to review the photos that Ms.Worth and Curtis had been able to access. <br /> Tyler Warnke,2147 Valley View Place, St.Paul said he was the equipment operator on the shop. I just <br /> want to reiterate that I went off what the plans were. I've never seen a slope this steep.And in order to get <br /> to the bottom,I had to dig around that. They said it was a road. It did look like a road but I can't reach all <br /> the way down to the bottom to pull out the timbers. So we're pulling up timbers going down as we go. <br /> Some of them are eight feet back and I have to dig those out.I'm not going to leave those in the ground, <br /> because when I construct the new walls,I have to go back. I`ve got to do the tie back. So it's different <br /> than just digging a hole. I've got to put a six foot to eight foot chunk on the back to nail the tie back to,to <br /> hold the wall., so all that has to be dug out. There's different aspects that made that difficult.Up on the top <br /> there's a tree and the neighbors were adamant about leaving the tree. So we worked around that and did <br /> what we could to keep it.And that's why there's a little adjustment over on that side just to keep and not <br /> destroy the roots on that tree. But it's just it's a big job,no doubt about it.A lot of the stuff had to be dug <br /> Page 4 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).