My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-2023 Planning Commission Packet
Orono
>
Planning Commission
>
2023
>
03-20-2023 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2023 8:33:44 AM
Creation date
3/21/2023 8:29:49 AM
Metadata
Text box
ID:
1
Creator:
Created:
3/21/2023 8:30 AM
Modified:
3/21/2023 8:30 AM
Text:
https://oronomn.granicus.com/MediaPlayer.php?view_id=1&clip_id=988&meta_id=49786
ID:
2
Creator:
Created:
3/21/2023 8:30 AM
Modified:
3/21/2023 8:30 AM
Text:
https://oronomn.granicus.com/MediaPlayer.php?view_id=1&clip_id=988&meta_id=49786
ID:
3
Creator:
Created:
3/21/2023 8:30 AM
Modified:
3/21/2023 8:30 AM
Text:
https://oronomn.granicus.com/MediaPlayer.php?view_id=1&clip_id=988&meta_id=49786
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION <br />February 21, 2023 <br />6:00 o'clock p.m. <br />ROLL CALL <br />The Orono Planning Commission met on the above-mentioned date with the following members present: <br />Chair Mark McCutcheon, Commissioners Scott Kirchner, Chris Bollis, Dennis Libby, Bob Erickson. <br />Commissioners Matt Gettman and Jon Ressler were absent. Representing Staff were Community <br />Development Director Laura Oakden, City Planner Melanie Curtis, and City Planner Natalie Nye. <br />Chair McCutcheon called the meeting to order at 6:00 p.m., followed by the Pledge of Allegiance. <br />APPROVAL OF AGENDA <br />Kirschner moved, Bollis seconded, to approve the Agenda. VOTE: Ayes 5, Nays 0. <br />APPROVAL OF PLANNING COMMISSION MEETING MINUTES OF JANUARY 17, 2023 <br />Libby moved, Kirchner seconded, to approve the minutes of the Orono Planning Commission <br />meeting of January 17, 2023. VOTE: Ayes 5, Nays 0. <br />PUBLIC HEARINGS <br />1. LA22-000068 VALDES LAWN CARE AND SNOW REMOVAL, LLC, 2815 CASCO <br />POINT ROAD, REQUESTS AN AFTER -THE -FACT 75 -FOOT LAKE SETBACK <br />VARIANCE FOR RETAINING WALLS. <br />City Planner Curtis reported that in July of 2022, the timber lake slope walls, deck and stairs to the lake at <br />this address were destroyed by fire. A building permit was issued to reconstruct the walls in-kind. During <br />the installation of the wall, staff observed that the construction had expanded beyond the "in-kind" <br />limitations. As a result, a stop -work order was issued. The applicant's engineer provided documentation <br />showing slope failure was imminent and needed an emergency correction. Because the work was halted <br />prior to construction, on Nov. 28 the City Council granted approval to install a final wall at the top of the <br />slope in order to protect the integrity of the slope upon spring thaw. That wall has not been installed. The <br />applicant is requesting to add 1.7 feet to the top wall that's existing rather than constructing a new <br />additional wall on the top of the slope, which would better accommodate the final grades and the lake <br />access stair. All the improvements are within the 75 -foot setback from the lake and within the bluff. The <br />newly -constructed timber walls are situated generally where the previously existing walls were located. <br />The new walls are not considered an "in-kind" replacement as the footprint of some of the walls extend <br />closer to the neighboring properties, are in different configurations and are in different locations than the <br />previously existing walls. The owner is requesting an after -the -fact variance to address the wall footprint <br />expansions in the bluff and lake yard. A lake stair is permitted within the 75 -foot setback and within the <br />bluff. The deck walkway and shed are not permitted but are able to be reconstructed in-kind. The property <br />owners can apply for a building permit to rebuild their decks and shed and the stairs as long as the <br />existing parameters are not exceeded. Because the new walls were installed in a slightly different <br />placement, size and configuration variances are required. The applicant identified the slope and existing <br />conditions as practical difficulty supporting the requested variances. They have provided the <br />documentation with the practical difficulty worksheet in your packets. They are here tonight as well. Staff <br />finds there are difficulties in the topography and challenges brought on by the fire which may support the <br />Page 1 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.