My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-2000 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2000-2009
>
2000
>
09-18-2000 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 4:21:23 PM
Creation date
3/16/2023 4:17:55 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r'. <br />MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />AUGUST 21,2000 <br />discussion was held with a number of the residents in the lobby of City Hall. The residents <br />expressed three major issues; one, a desire for no development; two, improve the runoff; and <br />three, less density. Behnke stated given those concerns expressed by the residents and the <br />concerns of the City Staff and Planning Commission, they have revised their plans to meet as <br />many of those concerns as possible. <br />Behnke stated in discussions with the City Engineer, reconunendations were made to redirect the <br />water runoff from this site, which has been resulted in a reduction of the water flow leaving the <br />site near the south ravine of 91.5 percent. Behnke stated in a 100 year flood, the normal flow <br />would be seven cubic feet per minute to .6 cubic feet per minute, or a reduction of 91.5 percent. <br />Behnke stated the ponding near the nordt ravine has resulted in the water runoff remaining the <br />same as what currently exists now. <br />Behnke stated he is in agreement that the roads should be public to this development. Behnke <br />stated he does not have a problem with the conservation easement for Outlot A. <br />Behnke noted they have just received Staff s report today, and in discussing tlie sewer with the <br />directional boring contractor, Behnke noted they are in agreement with Staff s recommendation, <br />which will result in a much lesser impact on Wildhurst. Behnke indicated the residents along <br />Wildhurst will still experience some road construction for a one or day in this area even with the <br />directional borings. <br />Behnke noted all proposed lots for this development do now meet the one acre dr^’ buildable <br />minimum, with the reduction in the number of lots resulting in a much better development overall. <br />Kathleen O’Kasper, 1067 Linden Avenue, stated over the years she has followed Stokes’ <br />developments, noting the building permits on some of hts developments have been issued to a <br />PAGE 20
The URL can be used to link to this page
Your browser does not support the video tag.